Today / needs review
PrioritySuggested action
Task ID: facct-2027-abstract-package
ACM FAccT 2027
Submit the mandatory paper-registration fields: representative title and abstract, final author list, focus areas and archival choice. In parallel, complete reviewer sign-ups and profile/conflict checks and draft the Generative AI Usage Statement for full-paper readiness.
- Deliverable
- submitted paper-registration record and receipt, plus a clearly separate full-paper profile/reviewer/AI-statement readiness checklist.
- Plan target
- Official milestone date: 28 October 2026 (today)
- Official milestone
- Official abstract registration: 27 October 2026 at 23:59 AoE; 28 October 12:59 CET in Budapest. At the verification cutoff, 6 hours 13 minutes remained. Full paper: 3 November 23:59 AoE; 4 November 12:59 CET. Author list and archival choice freeze at registration; profile/conflict, reviewer-form and Generative AI statement work supports the later full-paper stage.
ACM FAccT 2027 official source ↗Source checked: 28 October 2026
PriorityNeeds confirmation
Task ID: hri-2027-main-review-readiness
HRI 2027 main papers
If a valid full-paper submission exists, retrieve the released reviews when available and map every issue to evidence, revision scope and response ownership; do not treat this as a new-submission route.
- Deliverable
- review packet, issue-to-evidence matrix, rebuttal outline and owner/timing record for each response.
- Plan target
- Official milestone date: 28 October 2026 (today)
- Official milestone
- The organizer lists 28 October 2026 for full-paper reviews to be released without a release clock/timezone. The rebuttal closes 3 November 2026 at 23:59 AoE; 4 November 12:59 CET Budapest. These are milestones for existing submissions, not a new-submission route.
HRI 2027 main papers official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: emnlp-2026-attendance-decision
EMNLP 2026
If attendance is intended, use the official attendee route and build a Workshops and Tutorials Day 1 session and networking plan.
- Deliverable
- attendance/registration record if proceeding, badge plan, workshop/tutorial shortlist and networking targets.
- Plan target
- Suggested preparation target: 28 October 2026 (today)
- Official milestone
- EMNLP runs 24–29 October at HUNGEXPO in hybrid format. On 28 October, onsite registration is open 08:00–16:00; workshop/tutorial sessions run from 09:00, with the last session ending at 17:30. Onsite and virtual late registration remain listed through 29 October, subject to capacity. Paper-registration deadlines have passed.
EMNLP 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: webconf-2027-full-paper
The Web Conference 2027
Record whether the full paper was submitted before the closed deadline; if no timely abstract existed, close the long-paper route.
- Deliverable
- outcome record and submission receipt/final files if applicable.
- Plan target
- Suggested preparation target: 28 October 2026 (today)
- Official milestone
- The full-paper deadline passed on 26 October 2026 at 12:59 CET in Budapest. Only timely registered long-paper abstracts could proceed; no extension was promised.
The Web Conference 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: uist-2026-attendance-lodging
UIST 2026
If attending UIST, confirm late/on-site registration and lodging outside the closed hotel block, then prepare the Detroit programme plan.
- Deliverable
- lodging-outcome record and a current option if proceeding.
- Plan target
- Suggested preparation target: 27 October 2026 (1 day ago — review status)
- Official milestone
- UIST runs 2–5 November 2026 in person at the Detroit Marriott. Registration remains open and onsite registration is listed; workshops have limited space. The hotel block and childcare-grant application are closed, and no onsite childcare is provided.
UIST 2026 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: dh-benelux-2027-proposal-plan
DH Benelux 2027
Select a proposal format and prepare an anonymized outline and bibliography.
- Deliverable
- format decision, outline and evidence checklist.
- Plan target
- Suggested preparation target: 26 October 2026 (2 days ago — review status)
- Official milestone
- Official deadline: 7 December 2026, 23:59 CET; the submission portal remains forthcoming.
DH Benelux 2027 official source ↗Source checked: 25 October 2026
Needs confirmation
Task ID: uist-2026-childcare-grant
UIST 2026
Treat the childcare-grant deadline as passed; only record a late exception if the organizer form explicitly accepts one.
- Deliverable
- late-route status record and, only if accepted by the organizer form, childcare-grant application receipt.
- Plan target
- Suggested preparation target: 22 October 2026 (6 days ago — review status)
- Official milestone
- The organizer required applications before 23 October. That window has passed; no late acceptance is assumed unless the organizer explicitly confirms an exception.
UIST 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: acdsa-2027-submission-outcome
ACDSA 2027
Record whether an eligible paper was submitted before the extended 12 October closure.
- Deliverable
- outcome record and, if applicable, receipt and final files.
- Plan target
- Suggested preparation target: 21 October 2026 (7 days ago — review status)
- Official milestone
- Extended submission deadline passed 12 October 2026; no timezone was published. 2027 IEEE Xplore or Scopus inclusion is not guaranteed.
ACDSA 2027 official source ↗Source checked: 21 October 2026
Needs confirmation
Task ID: iui-2027-doctoral-consortium
ACM IUI 2027 Doctoral Consortium
Record whether an eligible application, PCS submission and separate advisor letter were completed before closure; do not infer completion.
- Deliverable
- outcome record and receipts if applicable.
- Plan target
- Suggested preparation target: 21 October 2026 (7 days ago — review status)
- Official milestone
- The official page gives 19 October 2026 for both the PCS submission and separate adviser letter; no cutoff clock or timezone is published.
ACM IUI 2027 Doctoral Consortium official source ↗Source checked: 25 October 2026
Needs confirmation
Task ID: coling-naacl-2027-author-profile-audit
COLING 2027 / NAACL 2027
For any October ARR paper, record whether every author’s functional OpenReview profile and ORCID were completed within the one-week grace period and remediate any gap promptly.
- Deliverable
- compliance/outcome record and earlier-form confirmations.
- Plan target
- Suggested preparation target: 21 October 2026 (7 days ago — review status)
- Official milestone
- The one-week point after 12 October 23:59 AoE passed on 20 October 13:59 CEST.
COLING 2027 / NAACL 2027 official source ↗Source checked: 21 October 2026
Needs confirmation
Task ID: hri-2027-pioneers-eligibility
HRI Pioneers 2027
Record whether an eligible student-led HRI application was filed before closure.
- Deliverable
- outcome record and receipt if applicable.
- Plan target
- Suggested preparation target: 21 October 2026 (7 days ago — review status)
- Official milestone
- Official deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
HRI Pioneers 2027 official source ↗Source checked: 21 October 2026
Needs confirmation
Task ID: webconf-2027-research-abstract
The Web Conference 2027 long-paper route
Record whether a valid long-paper abstract was registered before closure; otherwise close the long-paper route.
- Deliverable
- outcome and receipt if applicable.
- Plan target
- Suggested preparation target: 21 October 2026 (7 days ago — review status)
- Official milestone
- Official abstract deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
The Web Conference 2027 long-paper route official source ↗Source checked: 21 October 2026
Needs confirmation
Task ID: aacl-ijcnlp-2026-hotel-decision
AACL-IJCNLP 2026
Record whether official lodging was booked before the closed cutoff; if attendance remains intended, compare ordinary lodging without assuming organizer inventory.
- Deliverable
- lodging-outcome record and a current ordinary-lodging option if proceeding.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official hotel deadline passed 18 October 23:59 Beijing time.
AACL-IJCNLP 2026 official source ↗Source checked: 20 October 2026
Needs confirmation
Task ID: aistats-2027-paper-eligibility-finalize
AISTATS 2027
Record whether an eligible main-track paper was submitted before the closed deadline.
- Deliverable
- outcome record and, if applicable, receipt and final files.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official deadline passed 6 October 23:59 AoE.
AISTATS 2027 official source ↗Source checked: 20 October 2026
Needs confirmation
Task ID: coling-naacl-2027-arr-paper-finalize
COLING 2027 / NAACL 2027
Record whether the October ARR paper and post-submission forms were completed; preserve any receipt and final files.
- Deliverable
- outcome record and, if applicable, receipt, final PDF and form confirmations.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- The submission and 48-hour form windows have closed.
COLING 2027 / NAACL 2027 official source ↗Source checked: 20 October 2026
Needs confirmation
Task ID: eacl-2027-main-commitment
EACL 2027 main conference
Record whether an eligible reviewed ARR paper was committed before closure.
- Deliverable
- outcome record and, if applicable, confirmation.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official deadline passed 11 October 23:59 AoE.
EACL 2027 main conference official source ↗Source checked: 20 October 2026
Needs confirmation
Task ID: hri-2027-special-tracks-decision
HRI 2027 Industry White Papers
Record whether an eligible Industry White Paper was submitted before closure.
- Deliverable
- outcome record and, if applicable, receipt and final files.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official deadline passed 10 October 23:59 AoE.
HRI 2027 Industry White Papers official source ↗Source checked: 20 October 2026
Needs confirmation
Task ID: kdd-2027-first-cycle-rebuttal
KDD 2027 Research Track
Record whether an eligible first-cycle rebuttal was filed before closure.
- Deliverable
- outcome record and, if applicable, submitted rebuttal receipt.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official rebuttal window closed 14 October 13:59 CEST.
KDD 2027 Research Track official source ↗Source checked: 26 October 2026
Needs confirmation
Task ID: webconf-2027-tot-nomination
The Web Conference 2027 Test of Time Award
Record whether an eligible Test of Time nomination was filed before closure.
- Deliverable
- outcome record and, if applicable, nomination receipt.
- Plan target
- Suggested preparation target: 20 October 2026 (8 days ago — review status)
- Official milestone
- Official deadline passed 14 October 23:59 AoE.
The Web Conference 2027 Test of Time Award official source ↗Source checked: 20 October 2026
Next 7 days
Suggested action
Task ID: sigir-2027-proposed-cfp-monitor
SIGIR 2027
Monitor the new organizer site until the proposed dates become final, the 18/19 July event-start conflict is reconciled, the canonical SIGIR history links the edition and the OpenReview route becomes live.
- Deliverable
- finalized event and paper dates, reconciled event start, canonical series cross-link, authenticated submission route and registration details.
- Plan target
- Suggested preparation target: 29 October 2026 (in 1 day)
- Official milestone
- The organizer site proposes abstract registration on 14 January 2027 and paper submission on 21 January 2027, both AoE, but labels all dates proposed and says the OpenReview link is to come. The homepage gives 19–24 July in San Jose while other page footers say 18–24 July; registration and attendee support are TBA.
SIGIR 2027 official source ↗Source checked: 28 October 2026
PrioritySuggested action
Task ID: dhnb-2027-track-abstract-draft
DHNB 2027
Complete the eligible general, developmental, doctoral-consortium, or workshop/tutorial proposal and verify the new ConfTool account before submission.
- Deliverable
- track choice, title, contribution statement, evidence plan, compliant English proposal and portal-readiness check.
- Plan target
- Official milestone date: 30 October 2026 (in 2 days)
- Official milestone
- The official deadline was extended from 16 to 30 October 2026. ConfTool is live, but no cutoff clock or timezone is published; use 29 October as the conservative internal completion target.
DHNB 2027 official source ↗Source checked: 28 October 2026
PrioritySuggested action
Task ID: mlsys-2027-openreview-paper-readiness
MLSys 2027
Finish and submit the correct research-or-industry package, including profiles, conflicts, author-quota, appendix and AI-use checks; use the earlier official time while organizer pages disagree by one hour.
- Deliverable
- compliant paper of up to ten pages, a separately uploaded appendix if used, verified profiles, systems-contribution note, quota record, track decision, AI-use disclosure and submission receipt.
- Plan target
- Official milestone date: 30 October 2026 (in 2 days)
- Official milestone
- Official pages conflict: the CFP says 30 October 20:00 UTC (21:00 CET), while the dates page says 30 October 12:00 PDT (20:00 CET). Use 30 October 20:00 CET in Budapest as the safety cutoff; 2 days 13 hours 14 minutes remained at verification.
MLSys 2027 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: aistats-2027-workshop-proposal-decision
AISTATS 2027 Workshops
Make the workshop go/no-go decision, lock organizer roles and speaker confirmations, and submit the single-blind three-page proposal, schedule and diversity plan.
- Deliverable
- fit decision, three-page proposal, draft programme, organizer roles, confirmed-speaker table, contribution dates, diversity plan and receipt.
- Plan target
- Official milestone date: 30 October 2026 (in 2 days)
- Official milestone
- The official organizer call records an October 22 change to 30 October 2026 at 22:59 CET. The workshop is in person; online speakers are permitted only sparingly.
AISTATS 2027 Workshops official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: neurips-2026-attendance-registration
NeurIPS 2026
Join the Sydney/Atlanta waitlist or select virtual access; use the Paris route only as an eligible presenting author with a reserved place.
- Deliverable
- site/mode choice and registration or waitlist record.
- Plan target
- Suggested preparation target: 30 October 2026 (in 2 days)
- Official milestone
- Sydney and Atlanta physical inventory is sold out, with official waitlists and ticket releases; virtual access remains. Paris is presenting-authors-only, its non-presenter waitlist is closed, and reserved presenter seats expire after 30 October. The price table says 'until Oct 30 CET' without a clock.
NeurIPS 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: aacl-ijcnlp-2026-attendance-record
AACL-IJCNLP 2026
If attendance is intended, use the attendee-registration route and record the confirmation; do not treat it as a repair for the closed author/presenter linkage.
- Deliverable
- attendee decision and registration record if proceeding.
- Plan target
- Official milestone date: 31 October 2026 (in 3 days)
- Official milestone
- Late attendee registration closes 30 October 2026 at 23:59 AoE; 31 October 12:59 CET. The conference is 6–10 November in Hengqin/Zhuhai and online.
AACL-IJCNLP 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: qdlca-2027-preconference-workshop-eoi
QDLCA27 pre-conference research-infrastructure workshop
If the CLARIN-funded workshop is relevant, prepare and submit the short expression of interest.
- Deliverable
- eligibility/fit decision, cover letter and submission receipt.
- Plan target
- Official milestone date: 31 October 2026 (in 3 days)
- Official milestone
- The expression of interest closes 31 October 2026; no cutoff clock or timezone is published. The workshop is primarily for PhD candidates and early-career researchers, so eligibility must be confirmed.
QDLCA27 pre-conference research-infrastructure workshop official source ↗Source checked: 26 October 2026
Needs confirmation
Task ID: aaai-2027-author-feedback
AAAI-27
Only for a paper that reached author feedback, monitor from 24 October and prepare a concise evidence-based response.
- Deliverable
- eligibility confirmation and response record.
- Plan target
- Official milestone date: 1 November 2026 (in 4 days)
- Official milestone
- The organizer struck through 19–25 October and replaced it with 24–31 October; deadlines are AoE, so the window ends 1 November 12:59 CET Budapest.
AAAI-27 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: aaai-2027-aia-author-feedback
AAAI-27 AI Alignment
Only for an eligible existing AI Alignment submission, confirm that it remains in review and prepare a concise evidence-based author response.
- Deliverable
- eligibility confirmation and response record.
- Plan target
- Official milestone date: 3 November 2026 (in 6 days)
- Official milestone
- The AI Alignment author-feedback window is 27 October–2 November AoE, distinct from the main-track window; it closes 3 November 12:59 CET Budapest.
AAAI-27 AI Alignment official source ↗Source checked: 28 October 2026
Suggested action
Task ID: interspeech-2027-challenge-proposal
Interspeech 2027 Challenges
Finish the organizer-ready challenge proposal one day early and verify the missing submission route and cutoff timezone before relying on the date.
- Deliverable
- challenge proposal package and published-route check.
- Plan target
- Official milestone date: 3 November 2026 (in 6 days)
- Official milestone
- The official call lists 3 November 2026 but publishes neither a cutoff clock/timezone nor a submission mechanism. The package must cover task, rules, judging, data/baselines, dates, ethics/IRB availability and no more than 20 recommended reviewers.
Interspeech 2027 Challenges official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: wacv-2027-camera-ready
WACV 2027
Only for an accepted Round 1 or Round 2 paper, complete both the camera-ready package and author conference registration.
- Deliverable
- acceptance confirmation, camera-ready record, linked author-registration record and receipts.
- Plan target
- Official milestone date: 3 November 2026 (in 6 days)
- Official milestone
- Official accepted-author camera-ready and Author-registration deadline: 2 November AoE; 3 November 12:59 CET Budapest. The author page also warns that a paper is omitted if no Author registration records it by 17 November; treat that as an enforcement checkpoint, not an extension. Early pricing ends on 3 November 05:59 CET. Every accepted main or archival-workshop paper requires the Author category; virtual/workshop-only registration does not cover a paper.
WACV 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: wacv-2027-attendee-registration
WACV 2027
If attendance is intended, compare categories and register before early pricing closes.
- Deliverable
- attendance decision and registration record.
- Plan target
- Official milestone date: 3 November 2026 (in 6 days)
- Official milestone
- Early registration ends 2 November 23:59 ET; 3 November 05:59 CET Budapest. WACV runs 4–8 January 2027 at Disney Springs/Buena Vista, Florida, with in-person and virtual options. Accepted-paper author registration is a distinct obligation.
WACV 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: eaamo-2026-regular-registration
EAAMO 2026
If attending, complete regular registration safely by 3 November and verify whether the intended contribution requires physical presentation; grant recipients should wait for their complimentary code.
- Deliverable
- attendance decision and registration record.
- Plan target
- Official milestone date: 4 November 2026 (in 7 days)
- Official milestone
- EAAMO runs 5–7 November 2026 in Munich, with paid Zoom access to keynotes and paper presentations. Regular registration is listed 'by Nov 4' without a cutoff clock/timezone; use 3 November as the safety target.
EAAMO 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: neurips-2026-sydney-poster-print
NeurIPS 2026
Only for a confirmed Sydney poster presenter, place the advance printing order before the organizer cutoff.
- Deliverable
- eligibility confirmation, print-ready poster and order receipt.
- Plan target
- Official milestone date: 4 November 2026 (in 7 days)
- Official milestone
- The official page prints 4 November at 23:00 AEST, which is 14:00 CET literally, but Sydney observes AEDT then, which would be 13:00 CET. Use 13:00 CET as the conservative safety cutoff and recheck with the organizer.
NeurIPS 2026 official source ↗Source checked: 28 October 2026
Later & monitor
Needs confirmation
Task ID: chi-2027-revision-readiness
CHI 2027
If a valid CHI submission exists, monitor the desk-screen notification around 25 October and prepare for the 5 November review-release/revision window.
- Deliverable
- submission confirmation, review-triage sheet and revision plan.
- Plan target
- Suggested preparation target: 5 November 2026 (in 8 days)
- Official milestone
- Reviews are released and revision begins 5 November; exact release time is unpublished.
CHI 2027 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: cvpr-2027-workshop-proposal
CVPR 2027 Workshops
Prepare the compliant workshop proposal and email the listed workshop chairs to confirm the missing submission route; do not submit the proposal by email or guess a portal.
- Deliverable
- compliant proposal package, written route confirmation and authenticated submission receipt if the organizer activates the portal.
- Plan target
- Official milestone date: 5 November 2026 (in 8 days)
- Official milestone
- Official proposal deadline: 4 November 23:59 AoE; 5 November 12:59 CET Budapest. The call still labels the OpenReview URL TBD and says emailed proposals will not be accepted.
CVPR 2027 Workshops official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: iclr-2027-review-readiness
ICLR 2027
If a valid ICLR submission exists, prepare response triage; otherwise record closure.
- Deliverable
- submission confirmation, review-triage sheet and response owners.
- Plan target
- Suggested preparation target: 5 November 2026 (in 8 days)
- Official milestone
- Organizer milestone: reviews are released and discussion begins 5 November; exact release time is unpublished.
ICLR 2027 official source ↗Source checked: 26 October 2026
Needs confirmation
Task ID: log-2026-attendance-registration
LoG 2026
If attending, register by 5 November to avoid the undefined boundary and verify in-person presentation responsibility for any accepted work.
- Deliverable
- attendance decision and registration confirmation if proceeding.
- Plan target
- Suggested preparation target: 5 November 2026 (in 8 days)
- Official milestone
- The official registration, CFP and venue pages consistently place LoG 2026 at Northeastern University in Boston on 20–22 November, while the homepage search rendering shows stale conflicting Leipzig dates. Registration is USD 175 before 6 November and USD 200 after; the status of 6 November and cutoff timezone are unstated, so use 5 November as the safety target.
LoG 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: eacl-2027-srw-mentorship-eligibility
EACL 2027 Student Research Workshop
If eligible for the Student Research Workshop, prepare an anonymized ACL-format draft for optional mentorship and seek chair confirmation before relying on the conflicting direct-paper dates.
- Deliverable
- eligibility note, anonymized draft, portal receipt if submitted, and conflict record.
- Plan target
- Official milestone date: 6 November 2026 (in 9 days)
- Official milestone
- The CFP says optional mentorship drafts are due 6 November 2026 at 23:59 AoE, but the linked OpenReview venue shows 6 November 00:00 UTC; use the earlier 6 November 01:00 CET Budapest instant. The direct-paper CFP says 15 December AoE while linked portal metadata shows 15 November 00:00 UTC, and the CFP's ARR-commitment year conflicts with the event chronology. Obtain written chair confirmation before relying on those routes.
EACL 2027 Student Research Workshop official source ↗Source checked: 28 October 2026
Suggested action
Task ID: mdtt-2027-terminology-paper-scope
MDTT 2027
Scope a focused terminology/NLP paper and confirm author and portal readiness.
- Deliverable
- fit decision, contribution statement, evidence plan, outline and CMT readiness check.
- Plan target
- Suggested preparation target: 6 November 2026 (in 9 days)
- Official milestone
- Provisional organizer submission date: 18 December 2026, 23:59 AoE; CMT is live, while registration dates, fees and payment are unpublished.
MDTT 2027 official source ↗Source checked: 25 October 2026
Needs confirmation
Task ID: neurips-2026-childcare-reservation
NeurIPS 2026
Only for a registered Sydney or Atlanta attendee needing childcare, reconcile the organizer's date conflict and reserve while capacity remains.
- Deliverable
- registration confirmation, location-specific childcare reservation and conflict note.
- Plan target
- Official milestone date: 6 November 2026 (in 9 days)
- Official milestone
- Free childcare is capacity-limited and first-come. Location-specific guidance says Sydney and Atlanta reservations close 6 November without a cutoff clock/timezone, while the global Dates page gives 7 November 01:00 UTC (02:00 CET). Use 6 November as the conservative date; Paris uses personal emailed links.
NeurIPS 2026 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: interspeech-2027-special-session-proposal
Interspeech 2027 Special Sessions
Finish the organizer-ready special-session proposal one day early and verify the missing submission route and cutoff timezone before relying on the date.
- Deliverable
- special-session proposal package and published-route check.
- Plan target
- Official milestone date: 10 November 2026 (in 13 days)
- Official milestone
- The official call lists 10 November 2026 but publishes neither a cutoff clock/timezone nor a submission mechanism. The proposal needs a one-page case, organizer bios, anticipated submitters and no more than 20 recommended reviewers.
Interspeech 2027 Special Sessions official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: webconf-2027-short-abstract
The Web Conference 2027
Only for an eligible short-paper route, finalize the representative abstract and complete the frozen author list and order.
- Deliverable
- representative abstract, fixed author list/order, profile check and submission receipt.
- Plan target
- Official milestone date: 10 November 2026 (in 13 days)
- Official milestone
- Official research-short abstract registration: 9 November 2026 at 23:59 AoE; 10 November 12:59 CET. The author list freezes at abstract registration.
The Web Conference 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: cvpr-2027-scope-and-registration
CVPR 2027
Proceed only with a substantive vision or multimodal contribution and complete author profiles before mandatory paper enrollment.
- Deliverable
- scope decision and, if proceeding, enrolled-paper record plus author metadata.
- Plan target
- Official milestone date: 11 November 2026 (in 14 days)
- Official milestone
- Enrollment: 10 November AoE; full paper: 16 November AoE.
CVPR 2027 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: dh2027-submission-plan
ADHO DH2027
Choose an eligible ADHO format and prepare an evidence-backed outline.
- Deliverable
- format decision, title, contribution statement, evidence plan and outline.
- Plan target
- Suggested preparation target: 13 November 2026 (in 16 days)
- Official milestone
- Official proposal deadline: 20 November 2026 at 23:59 AoE; 21 November 12:59 CET. Use 13 November as an internal completeness target.
ADHO DH2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: neurips-2026-poster-video
NeurIPS 2026
Only for an accepted poster, decide whether to prepare the organizer-recommended optional video.
- Deliverable
- eligibility confirmation and, if useful, uploaded poster video with receipt.
- Plan target
- Suggested preparation target: 13 November 2026 (in 16 days)
- Official milestone
- Organizer-recommended, not required, video date: 13 November; no cutoff time or timezone is published.
NeurIPS 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: neurips-2026-poster-topic-session
NeurIPS 2026
Only for an accepted main-conference poster, update the best-fit topic and confirm the session assignment before the organizer checkpoint.
- Deliverable
- eligibility confirmation, recorded best-fit topic and session assignment.
- Plan target
- Official milestone date: 16 November 2026 (in 19 days)
- Official milestone
- Official poster topic/session checkpoint: 15 November AoE; 16 November 12:59 CET Budapest.
NeurIPS 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: webconf-2027-demo-submission
The Web Conference 2027
Prepare the four-page non-anonymous demo paper and stable implemented-system demo or video link.
- Deliverable
- eligibility confirmation, demonstration package, presenter confirmation, submitted files and receipt.
- Plan target
- Official milestone date: 17 November 2026 (in 20 days)
- Official milestone
- Official demo deadline: 16 November 2026 at 23:59 AoE; 17 November 12:59 CET. The call expects an implemented and tested system.
The Web Conference 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: webconf-2027-short-paper
The Web Conference 2027
Only after a timely short-paper abstract, finish the compliant four-page paper using the frozen author list and order.
- Deliverable
- compliant paper, author/profile check, submitted files and receipt.
- Plan target
- Official milestone date: 17 November 2026 (in 20 days)
- Official milestone
- Official research-short paper deadline: 16 November 2026 at 23:59 AoE; 17 November 12:59 CET. A timely short-paper abstract is required.
The Web Conference 2027 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: eddi-2026-attendance-registration
EDDI 2026
If attending, recheck the live registration route and register before the earlier literal interpretation of the anomalous November timezone label.
- Deliverable
- verified registration boundary, final fee/eligibility record and attendee confirmation if proceeding.
- Plan target
- Official milestone date: 19 November 2026 (in 22 days)
- Official milestone
- The current official page lists early-bird registration through 19 November 23:59 CEST and closure on 26 November 09:59 CEST. Because Brussels and Budapest are on CET in November, use 19 November 22:59 CET as the conservative literal boundary and recheck before payment.
EDDI 2026 official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: hri-2027-videos-demos-sdc
HRI 2027 videos/demos and Student Design Competition
Only if an eligible HRI video/demo or Student Design Competition entry is intended, choose the correct call and prepare its distinct submission package.
- Deliverable
- call and eligibility decision, compliant package, author/profile check and submission receipt if proceeding.
- Plan target
- Official milestone date: 21 November 2026 (in 24 days)
- Official milestone
- Official submission date: 20 November 2026 at 23:59 AoE; 21 November 12:59 CET Budapest. These calls are distinct from the closed main-paper route.
HRI 2027 videos/demos and Student Design Competition official source ↗Source checked: 28 October 2026
Needs confirmation
Task ID: siggraph-asia-2026-attendance-registration
SIGGRAPH Asia 2026
If attending or presenting, select the correct in-person registration category and record the presenter obligation for any accepted work.
- Deliverable
- registration decision, category/fee record and conditional presenter checklist.
- Plan target
- Official milestone date: 30 November 2026 (in 33 days)
- Official milestone
- Regular registration ends 30 November 2026 at 23:59 GMT+8; 16:59 CET Budapest. One contributor per accepted work must register, and technical-paper presenters need Full Conference registration and in-person presentation.
SIGGRAPH Asia 2026 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: webconf-2027-tutorial-proposal
The Web Conference 2027 Tutorials
Reassess whether a justified tutorial with an in-person presenter is worth preparing.
- Deliverable
- go/no-go decision and, if proceeding, four-page proposal outline, teaser plan and presenter confirmation.
- Plan target
- Suggested preparation target: 1 December 2026 (in 34 days)
- Official milestone
- Official deadline: 4 January 2027 at 23:59 AoE. Recheck the organizer-linked portal before submission and do not assume an extension.
The Web Conference 2027 Tutorials official source ↗Source checked: 25 October 2026
Suggested action
Task ID: acl-2027-arr-readiness
ACL 2027
Reserve the January ARR cycle and prepare author-profile and contributor readiness.
- Deliverable
- scope decision, timeline, verified metadata and ARR checklist.
- Plan target
- Suggested preparation target: 4 December 2026 (in 37 days)
- Official milestone
- Official ARR deadline: 4 January 2027, 23:59 AoE.
ACL 2027 official source ↗Source checked: 25 October 2026
Needs confirmation
Task ID: dariah-hr-2026-proceedings-followup
DARIAH-HR Digital Humanities & Heritage proceedings
Only if the author actually presented a paper or poster at DHH 2025 or DHH 2026, confirm eligibility and decide whether to prepare the joint-proceedings manuscript.
- Deliverable
- paper-or-poster presenter eligibility record and, if eligible and proceeding, a compliant manuscript plan and submission receipt.
- Plan target
- Official milestone date: 17 January 2027 (in 81 days)
- Official milestone
- The official post-event report invites authors who presented a paper or poster at DHH 2025 or DHH 2026 to submit to the joint proceedings by 17 January 2027; no cutoff clock or timezone is published.
DARIAH-HR Digital Humanities & Heritage proceedings official source ↗Source checked: 26 October 2026
Suggested action
Task ID: interspeech-2027-main-paper-monitor
Interspeech 2027 main papers
Monitor for the 19 January portal opening and verify the missing deadline clock/timezone and final templates before relying on the 9 February date.
- Deliverable
- live submission-instructions page, authenticated portal, final requirements and deadline-timezone record.
- Plan target
- Official milestone date: 9 February 2027 (in 104 days)
- Official milestone
- The official CFP lists portal opening on 19 January 2027, submission on 9 February, update on 16 February, acceptance on 2 June and camera-ready on 9 June, but no cutoff clock/timezone is published.
Interspeech 2027 main papers official source ↗Source checked: 28 October 2026
Suggested action
Task ID: tpdl-2027-cfp-monitor
TPDL 2027
Monitor for a finalized CFP, live EasyChair route, a published workshop-notification date, final camera-ready day, fees, registration and final track instructions.
- Deliverable
- verified CFP, finalized milestones, submission requirements, track-choice criteria and authenticated submission route.
- Plan target
- Monitor for an official update
- Official milestone
- Conference pages show workshop proposals on 20 February, abstract registration on 2 April and paper submission on 9 April 2027, all at 23:59 AoE, with notification on 30 May and camera-ready in July on a day to be announced; the official series announcement still labels the milestones tentative. EasyChair is still coming soon; registration opens in 2027 and fees remain TBD.
TPDL 2027 official source ↗Source checked: 28 October 2026
Suggested action
Task ID: uist-2027-cfp-monitor
UIST 2027
Monitor the new Vienna edition page for conference dates, the CFP, submission routes and registration details.
- Deliverable
- verified edition dates, CFP, milestone/timezone table, eligibility rules and authenticated submission route.
- Plan target
- Monitor for an official update
- Official milestone
- The official 40th ACM UIST 2027 page newly identifies Vienna and says details are coming soon; no dates, CFP, submission deadline or registration route is published.