Daily briefings
ATLAS

Research. Knowledge. Opportunity.
A clearer view of what comes next.

Academic conference deadlines and preparation — 29 October 2026

Archived edition. Findings, availability and deadlines reflect this report’s date; consult current original sources before acting.

Today’s three priority actions

  1. MLSys 2027 — finish and submit the correct research-or-industry package. Official pages differ by one hour; use the earlier 30 October 20:00 CET safety cutoff, with 1 day 12 hours 42 minutes remaining at verification. Deliverable: compliant double-blind paper of up to ten pages, a separately uploaded appendix if used, verified profiles/conflicts, author-quota record, track decision, AI-use disclosure and receipt. Official CFP · Official dates
  2. DHNB 2027 — complete the proposal today. The organizer extended the deadline to 30 October but publishes no clock or timezone, so 29 October is the recommended internal finish. Deliverable: track choice, contribution statement, evidence plan, compliant proposal and verified ConfTool route. Official CFP
  3. AISTATS 2027 Workshops — make the go/no-go decision and submit the complete workshop package. The workshop-specific call records the revised deadline as 30 October 22:59 CET, with 1 day 15 hours 41 minutes remaining. Deliverable: three-page proposal, programme, organizer roles, confirmed-speaker table, contribution dates, diversity plan and receipt. Official workshop call

Conference planner

Daily activities & tasks

Plan verified for . Preparation targets are recommendations; official deadlines are labelled separately.

Today / needs review

PrioritySuggested action

Task ID: dhnb-2027-track-abstract-draft

DHNB 2027

Complete the eligible general, developmental, doctoral-consortium or workshop/tutorial proposal today and verify the ConfTool route before the organizer's date-only deadline.

Deliverable
track choice, title, contribution statement, evidence plan, compliant English proposal and portal-readiness check.
Plan target
Suggested preparation target: 29 October 2026 (today)
Official milestone
The official deadline was extended from 16 to 30 October 2026. The official CFP links ConfTool but publishes no cutoff clock or timezone; finish on 29 October as a conservative internal target and confirm the signed-in portal before submission.
DHNB 2027 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: facct-2027-abstract-package

ACM FAccT 2027

Record whether the mandatory paper-registration fields were submitted before closure; if not, close the paper route. Do not infer completion from the passed deadline.

Deliverable
outcome record and registration receipt if applicable.
Plan target
Suggested preparation target: 29 October 2026 (today)
Official milestone
The mandatory abstract registration passed on 27 October 2026 at 23:59 AoE, equivalent to 28 October 12:59 CET in Budapest. The author list and archival choice froze at registration; only timely registered papers may continue to full-paper upload.
ACM FAccT 2027 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: emnlp-2026-attendance-decision

EMNLP 2026

If attending, use the final-day attendee route and build a final-day workshop session and networking plan; do not use the closed paper-registration route.

Deliverable
attendance/registration record if proceeding, badge plan, final-day workshop shortlist and networking targets.
Plan target
Suggested preparation target: 29 October 2026 (today)
Official milestone
EMNLP runs 24–29 October at HUNGEXPO in hybrid format. On 29 October, onsite registration is open 08:00–16:00 and workshops run 09:00–17:30. The official linked portal still lists one-day onsite and virtual passes, subject to capacity. Paper-registration deadlines have passed.
EMNLP 2026 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: webconf-2027-full-paper

The Web Conference 2027

Record whether the full paper was submitted before the closed deadline; if no timely abstract existed, close the long-paper route.

Deliverable
outcome record and submission receipt/final files if applicable.
Plan target
Suggested preparation target: 28 October 2026 (1 day ago — review status)
Official milestone
The full-paper deadline passed on 26 October 2026 at 12:59 CET in Budapest. Only timely registered long-paper abstracts could proceed; no extension was promised.
The Web Conference 2027 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: uist-2026-attendance-lodging

UIST 2026

If attending, complete late or onsite registration and plan the 2 November workshops and 3–5 November main programme.

Deliverable
attendance decision, registration record, travel/lodging record and session plan.
Plan target
Suggested preparation target: 27 October 2026 (2 days ago — review status)
Official milestone
UIST 2026 is fully in person in Detroit, 2–5 November; main conference 3–5 November. Registration and onsite registration remain open. No capacity or waitlist notice is published; workshop space can be limited.
UIST 2026 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: dh-benelux-2027-proposal-plan

DH Benelux 2027

Select a proposal format and prepare an anonymized outline and bibliography.

Deliverable
format decision, outline and evidence checklist.
Plan target
Suggested preparation target: 26 October 2026 (3 days ago — review status)
Official milestone
Official deadline: 7 December 2026, 23:59 CET; the submission portal remains forthcoming.
DH Benelux 2027 official source ↗

Source checked: 25 October 2026

Needs confirmation

Task ID: uist-2026-childcare-grant

UIST 2026

Treat the childcare-grant deadline as passed; only record a late exception if the organizer form explicitly accepts one.

Deliverable
late-route status record and, only if accepted by the organizer form, childcare-grant application receipt.
Plan target
Suggested preparation target: 22 October 2026 (7 days ago — review status)
Official milestone
The organizer required applications before 23 October. That window has passed; no late acceptance is assumed unless the organizer explicitly confirms an exception.
UIST 2026 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: acdsa-2027-submission-outcome

ACDSA 2027

Record whether an eligible paper was submitted before the extended 12 October closure.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 21 October 2026 (8 days ago — review status)
Official milestone
Extended submission deadline passed 12 October 2026; no timezone was published. 2027 IEEE Xplore or Scopus inclusion is not guaranteed.
ACDSA 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: iui-2027-doctoral-consortium

ACM IUI 2027 Doctoral Consortium

Record whether an eligible application, PCS submission and separate advisor letter were completed before closure; do not infer completion.

Deliverable
outcome record and receipts if applicable.
Plan target
Suggested preparation target: 21 October 2026 (8 days ago — review status)
Official milestone
The official page gives 19 October 2026 for both the PCS submission and separate adviser letter; no cutoff clock or timezone is published.
ACM IUI 2027 Doctoral Consortium official source ↗

Source checked: 25 October 2026

Needs confirmation

Task ID: coling-naacl-2027-author-profile-audit

COLING 2027 / NAACL 2027

For any October ARR paper, record whether every author’s functional OpenReview profile and ORCID were completed within the one-week grace period and remediate any gap promptly.

Deliverable
compliance/outcome record and earlier-form confirmations.
Plan target
Suggested preparation target: 21 October 2026 (8 days ago — review status)
Official milestone
The one-week point after 12 October 23:59 AoE passed on 20 October 13:59 CEST.
COLING 2027 / NAACL 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: hri-2027-pioneers-eligibility

HRI Pioneers 2027

Record whether an eligible student-led HRI application was filed before closure.

Deliverable
outcome record and receipt if applicable.
Plan target
Suggested preparation target: 21 October 2026 (8 days ago — review status)
Official milestone
Official deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
HRI Pioneers 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: webconf-2027-research-abstract

The Web Conference 2027 long-paper route

Record whether a valid long-paper abstract was registered before closure; otherwise close the long-paper route.

Deliverable
outcome and receipt if applicable.
Plan target
Suggested preparation target: 21 October 2026 (8 days ago — review status)
Official milestone
Official abstract deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
The Web Conference 2027 long-paper route official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: aacl-ijcnlp-2026-hotel-decision

AACL-IJCNLP 2026

Record whether official lodging was booked before the closed cutoff; if attendance remains intended, compare ordinary lodging without assuming organizer inventory.

Deliverable
lodging-outcome record and a current ordinary-lodging option if proceeding.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official hotel deadline passed 18 October 23:59 Beijing time.
AACL-IJCNLP 2026 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: aistats-2027-paper-eligibility-finalize

AISTATS 2027

Record whether an eligible main-track paper was submitted before the closed deadline.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official deadline passed 6 October 23:59 AoE.
AISTATS 2027 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: coling-naacl-2027-arr-paper-finalize

COLING 2027 / NAACL 2027

Record whether the October ARR paper and post-submission forms were completed; preserve any receipt and final files.

Deliverable
outcome record and, if applicable, receipt, final PDF and form confirmations.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
The submission and 48-hour form windows have closed.
COLING 2027 / NAACL 2027 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: eacl-2027-main-commitment

EACL 2027 main conference

Record whether an eligible reviewed ARR paper was committed before closure.

Deliverable
outcome record and, if applicable, confirmation.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official deadline passed 11 October 23:59 AoE.
EACL 2027 main conference official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: hri-2027-special-tracks-decision

HRI 2027 Industry White Papers

Record whether an eligible Industry White Paper was submitted before closure.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official deadline passed 10 October 23:59 AoE.
HRI 2027 Industry White Papers official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: kdd-2027-first-cycle-rebuttal

KDD 2027 Research Track

Record whether an eligible first-cycle rebuttal was filed before closure.

Deliverable
outcome record and, if applicable, submitted rebuttal receipt.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official rebuttal window closed 14 October 13:59 CEST.
KDD 2027 Research Track official source ↗

Source checked: 26 October 2026

Needs confirmation

Task ID: webconf-2027-tot-nomination

The Web Conference 2027 Test of Time Award

Record whether an eligible Test of Time nomination was filed before closure.

Deliverable
outcome record and, if applicable, nomination receipt.
Plan target
Suggested preparation target: 20 October 2026 (9 days ago — review status)
Official milestone
Official deadline passed 14 October 23:59 AoE.
The Web Conference 2027 Test of Time Award official source ↗

Source checked: 20 October 2026

Next 7 days

PrioritySuggested action

Task ID: mlsys-2027-openreview-paper-readiness

MLSys 2027

Finish and submit the correct research-or-industry package, including profiles, conflicts, author-quota, appendix and AI-use checks; use the earlier official time while organizer pages disagree by one hour.

Deliverable
compliant double-blind paper of up to ten pages, a separately uploaded appendix if used, verified profiles, systems-contribution note, quota record, track decision, AI-use disclosure and submission receipt.
Plan target
Official milestone date: 30 October 2026 (in 1 day)
Official milestone
Official pages conflict: the CFP says 30 October 20:00 UTC (21:00 CET), while the dates page says 30 October 12:00 PDT (20:00 CET). Use 30 October 20:00 CET in Budapest as the safety cutoff; 1 day 12 hours 42 minutes remained at verification. Industrial-track first-author and majority-author eligibility must be satisfied, and track switching is barred after submission.
MLSys 2027 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: aistats-2027-workshop-proposal-decision

AISTATS 2027 Workshops

Make the workshop go/no-go decision, lock organizer roles and speaker confirmations, and submit the single-blind three-page proposal, schedule and diversity plan.

Deliverable
fit decision, three-page proposal, draft programme, organizer roles, confirmed-speaker table, contribution dates, diversity plan and receipt.
Plan target
Official milestone date: 30 October 2026 (in 1 day)
Official milestone
The workshop-specific official call records an October 22 change to 30 October 2026 at 22:59 CET. It supersedes the generic CFP's AoE wording. The workshop is in person; online speakers are permitted only sparingly.
AISTATS 2027 Workshops official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: aacl-ijcnlp-2026-attendance-record

AACL-IJCNLP 2026

If attendance is intended, use the attendee-registration route and record the confirmation; do not treat it as a repair for the closed author/presenter linkage.

Deliverable
attendee decision and registration record if proceeding.
Plan target
Official milestone date: 31 October 2026 (in 2 days)
Official milestone
Late attendee registration closes 30 October 2026 at 23:59 AoE; 31 October 12:59 CET. The conference is 6–10 November in Hengqin/Zhuhai and online. ACL 2026 membership is mandatory. Accepted-paper author registration closed earlier and is distinct from attendee registration.
AACL-IJCNLP 2026 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: neurips-2026-attendance-registration

NeurIPS 2026

Join the Sydney or Atlanta waitlist or select virtual access; use the Paris route only as an eligible presenting author with a reserved place.

Deliverable
site/mode choice and registration or waitlist record.
Plan target
Official milestone date: 31 October 2026 (in 2 days)
Official milestone
NeurIPS 2026 is not in San Diego: Sydney runs 6–12 December, while Atlanta and Paris run 9–13 December, with virtual access. Sydney and Atlanta physical inventory is sold out to general attendees and waitlists are active. Early pricing ends 30 October 23:59 AoE, equivalent to 31 October 12:59 CET. Paris uses a separate route and presenting-author restrictions.
NeurIPS 2026 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: qdlca-2027-preconference-workshop-eoi

QDLCA27 pre-conference research-infrastructure workshop

If the CLARIN-funded workshop is relevant, prepare and submit the short expression of interest.

Deliverable
eligibility/fit decision, cover letter and submission receipt.
Plan target
Official milestone date: 31 October 2026 (in 2 days)
Official milestone
The expression of interest closes 31 October 2026; no cutoff clock or timezone is published. The workshop is primarily for PhD candidates and early-career researchers, so eligibility must be confirmed.
QDLCA27 pre-conference research-infrastructure workshop official source ↗

Source checked: 26 October 2026

Needs confirmation

Task ID: wsdm-2027-industry-day-talk

WSDM 2027 Industry Day

If there is genuine deployed-system experience with technical substance, decide whether to submit the single-blind Industry Day talk proposal.

This is a newly identified open specialist route; it is not the closed WSDM research-paper track.

Deliverable
go/no-go decision and, if proceeding, up-to-two-page proposal, deployment evidence, presentation plan and receipt.
Plan target
Official milestone date: 31 October 2026 (in 2 days)
Official milestone
Submission deadline: 30 October 2026 at 23:59 AoE; 31 October 12:59 CET in Budapest. In-person presentation is required. The official call links Microsoft CMT.
WSDM 2027 Industry Day official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: aaai-2027-author-feedback

AAAI-27

Only for a paper that reached author feedback, monitor from 24 October and prepare a concise evidence-based response.

Deliverable
eligibility confirmation and response record.
Plan target
Official milestone date: 1 November 2026 (in 3 days)
Official milestone
The organizer struck through 19–25 October and replaced it with 24–31 October; deadlines are AoE, so the window ends 1 November 12:59 CET Budapest.
AAAI-27 official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: interspeech-2027-challenge-proposal

Interspeech 2027 Challenges

Finish the organizer-ready challenge proposal one day early and verify the missing submission route and cutoff timezone before relying on the date.

Deliverable
challenge proposal package and published-route check.
Plan target
Suggested preparation target: 2 November 2026 (in 4 days)
Official milestone
The official call lists 3 November 2026 but publishes neither a cutoff clock/timezone nor a submission mechanism. The package must cover task, rules, judging, data/baselines, dates, ethics/IRB availability and no more than 20 recommended reviewers.
Interspeech 2027 Challenges official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: aaai-2027-aia-author-feedback

AAAI-27 AI Alignment

Only for an eligible existing AI Alignment submission, confirm that it remains in review and prepare a concise evidence-based author response.

Deliverable
eligibility confirmation and response record.
Plan target
Official milestone date: 3 November 2026 (in 5 days)
Official milestone
The AI Alignment author-feedback window is 27 October–2 November AoE, distinct from the main-track window; it closes 3 November 12:59 CET Budapest.
AAAI-27 AI Alignment official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: eaamo-2026-regular-registration

EAAMO 2026

If attending, complete regular registration safely by 3 November and verify whether the intended contribution requires physical presentation; grant recipients should wait for their complimentary code.

Deliverable
attendance decision and registration record.
Plan target
Suggested preparation target: 3 November 2026 (in 5 days)
Official milestone
EAAMO runs 5–7 November at LMU Munich with virtual access. Regular registration is listed 'by Nov 4' without a cutoff clock or timezone; use 3 November as the safety target. Grant recipients should wait for their complimentary code because earlier payment is not reimbursed.
EAAMO 2026 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: wacv-2027-camera-ready

WACV 2027

Only for an accepted Round 1 or Round 2 paper, complete both the camera-ready package and author conference registration.

Deliverable
acceptance confirmation, camera-ready record, linked author-registration record and receipts.
Plan target
Official milestone date: 3 November 2026 (in 5 days)
Official milestone
Accepted-author camera-ready and Author-registration deadline: 2 November 23:59 AoE; 3 November 12:59 CET Budapest. The author page also warns that a paper is omitted if no Author registration records it by 17 November; treat that as enforcement, not an extension. Virtual/workshop-only registration does not cover a paper.
WACV 2027 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: wacv-2027-attendee-registration

WACV 2027

If attendance is intended, compare categories and register before early pricing closes.

Deliverable
attendance decision and registration record.
Plan target
Official milestone date: 3 November 2026 (in 5 days)
Official milestone
Early registration ends 2 November 23:59 ET, equivalent to 3 November 05:59 CET. WACV runs 4–8 January 2027 at Disney Springs/Buena Vista, Florida, with in-person and virtual options. Accepted-paper author registration is a distinct obligation.
WACV 2027 official source ↗

Source checked: 29 October 2026

PriorityNeeds confirmation

Task ID: facct-2027-full-paper

ACM FAccT 2027

Only if the mandatory paper registration was completed on time, finish the full paper, reviewer obligations, profiles/conflicts and Generative AI Usage Statement.

The full-paper route remains open only for timely registered papers; the abstract gate cannot be repaired.

Deliverable
eligibility confirmation, compliant full paper, reviewer-signup/profile checklist, AI-use statement and submission receipt.
Plan target
Official milestone date: 4 November 2026 (in 6 days)
Official milestone
Full paper: 3 November 2026 at 23:59 AoE; 4 November 12:59 CET in Budapest. Author list and archival choice froze at the closed registration gate. All authors must sign up to review; noncompliance can lead to desk rejection.
ACM FAccT 2027 official source ↗

Source checked: 29 October 2026

PriorityNeeds confirmation

Task ID: hri-2027-main-review-readiness

HRI 2027 main papers

If a valid full-paper submission exists, retrieve the released reviews, map each issue to evidence and prepare the rebuttal.

Deliverable
submission confirmation, review packet, issue-to-evidence matrix, rebuttal draft and response record.
Plan target
Official milestone date: 4 November 2026 (in 6 days)
Official milestone
Full-paper reviews were scheduled for release on 28 October without a published clock. The rebuttal closes 3 November 23:59 AoE, equivalent to 4 November 12:59 CET in Budapest. This is not a new-submission route.
HRI 2027 main papers official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: neurips-2026-sydney-poster-print

NeurIPS 2026

Only for a confirmed Sydney poster presenter, place the advance printing order before the organizer cutoff.

Deliverable
eligibility confirmation, print-ready poster and order receipt.
Plan target
Official milestone date: 4 November 2026 (in 6 days)
Official milestone
The official page prints 4 November at 23:00 AEST, which is 14:00 CET literally, but Sydney observes AEDT then, which would be 13:00 CET. Use 13:00 CET as the conservative safety cutoff and recheck with the organizer.
NeurIPS 2026 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: chi-2027-revision-readiness

CHI 2027

If a valid CHI submission exists, monitor the desk-screen notification around 25 October and prepare for the 5 November review-release/revision window.

Deliverable
submission confirmation, review-triage sheet and revision plan.
Plan target
Suggested preparation target: 5 November 2026 (in 7 days)
Official milestone
Reviews are released and revision begins 5 November; exact release time is unpublished.
CHI 2027 official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: cvpr-2027-workshop-proposal

CVPR 2027 Workshops

Finish the compliant workshop proposal and submit through the now-live official OpenReview Workshop Proposals route.

Deliverable
up-to-eight-page proposal, organizer-role and diversity record, in-person programme plan and authenticated submission receipt.
Plan target
Official milestone date: 5 November 2026 (in 7 days)
Official milestone
Official proposal deadline: 4 November 23:59 AoE; 5 November 12:59 CET Budapest. The official call now links the OpenReview Workshop Proposals route. One organizer may serve on at most three workshops.
CVPR 2027 Workshops official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: iclr-2027-review-readiness

ICLR 2027

If a valid ICLR submission exists, prepare response triage; otherwise record closure.

Deliverable
submission confirmation, review-triage sheet and response owners.
Plan target
Suggested preparation target: 5 November 2026 (in 7 days)
Official milestone
Organizer milestone: reviews are released and discussion begins 5 November; exact release time is unpublished.
ICLR 2027 official source ↗

Source checked: 26 October 2026

Needs confirmation

Task ID: log-2026-attendance-registration

LoG 2026

If attending, register by 5 November to avoid the undefined boundary and verify in-person presentation responsibility for any accepted work.

Deliverable
attendance decision and registration confirmation if proceeding.
Plan target
Suggested preparation target: 5 November 2026 (in 7 days)
Official milestone
LoG runs fully in person at Northeastern University in Boston, 20–22 November. Registration is USD 175 before 6 November and USD 200 after; the exact cutoff clock/timezone is unpublished, so use 5 November as a safe target. At least one author per oral or poster must attend in person.
LoG 2026 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: sigir-2027-proposed-cfp-monitor

SIGIR 2027

Monitor until proposed dates become final, the 18/19 July event-start conflict is reconciled, the canonical SIGIR history links the edition and the OpenReview route becomes live.

Deliverable
finalized event and paper dates, reconciled event start, canonical series cross-link, authenticated submission route and registration details.
Plan target
Suggested preparation target: 5 November 2026 (in 7 days)
Official milestone
The organizer site confirms San Jose but conflicts between 19–24 July on the homepage and 18–24 July in official footers. Full-paper abstract registration on 14 January and paper submission on 21 January are labelled proposed; the OpenReview link is still 'to come.'
SIGIR 2027 official source ↗

Source checked: 29 October 2026

Later & monitor

Needs confirmation

Task ID: eacl-2027-srw-mentorship-eligibility

EACL 2027 Student Research Workshop

If eligible for the Student Research Workshop, prepare an anonymized ACL-format draft for optional mentorship and seek chair confirmation before relying on the conflicting direct-paper dates.

Deliverable
eligibility note, anonymized draft, portal receipt if submitted, and conflict record.
Plan target
Official milestone date: 6 November 2026 (in 8 days)
Official milestone
The CFP says optional mentorship drafts are due 6 November 2026 at 23:59 AoE, but the linked OpenReview venue shows 6 November 00:00 UTC; use the earlier 6 November 01:00 CET Budapest instant. The direct-paper CFP says 15 December AoE while linked portal metadata shows 15 November 00:00 UTC, and the CFP's ARR-commitment year conflicts with the event chronology. Obtain written chair confirmation before relying on those routes.
EACL 2027 Student Research Workshop official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: mdtt-2027-terminology-paper-scope

MDTT 2027

Scope a focused terminology/NLP paper and confirm author and portal readiness.

Deliverable
fit decision, contribution statement, evidence plan, outline and CMT readiness check.
Plan target
Suggested preparation target: 6 November 2026 (in 8 days)
Official milestone
Provisional organizer submission date: 18 December 2026, 23:59 AoE; CMT is live, while registration dates, fees and payment are unpublished.
MDTT 2027 official source ↗

Source checked: 25 October 2026

Needs confirmation

Task ID: neurips-2026-childcare-reservation

NeurIPS 2026

Only for a registered Sydney or Atlanta attendee needing childcare, reconcile the organizer's date conflict and reserve while capacity remains.

Deliverable
registration confirmation, location-specific childcare reservation and conflict note.
Plan target
Official milestone date: 6 November 2026 (in 8 days)
Official milestone
Free childcare is capacity-limited and first-come. Location-specific guidance says Sydney and Atlanta reservations close 6 November without a cutoff clock/timezone, while the global Dates page gives 7 November 01:00 UTC (02:00 CET). Use 6 November as the conservative date; Paris uses personal emailed links.
NeurIPS 2026 official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: interspeech-2027-special-session-proposal

Interspeech 2027 Special Sessions

Finish the organizer-ready special-session proposal one day early and verify the missing submission route and cutoff timezone before relying on the date.

Deliverable
special-session proposal package and published-route check.
Plan target
Suggested preparation target: 9 November 2026 (in 11 days)
Official milestone
The official call lists 10 November 2026 but publishes neither a cutoff clock/timezone nor a submission mechanism. The proposal needs a one-page case, organizer bios, anticipated submitters and no more than 20 recommended reviewers.
Interspeech 2027 Special Sessions official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: webconf-2027-short-abstract

The Web Conference 2027

Only for an eligible short-paper route, finalize the representative abstract and complete the frozen author list and order.

Deliverable
representative abstract, fixed author list/order, profile check and submission receipt.
Plan target
Official milestone date: 10 November 2026 (in 12 days)
Official milestone
Official research-short abstract registration: 9 November 2026 at 23:59 AoE; 10 November 12:59 CET. The author list freezes at abstract registration.
The Web Conference 2027 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: cvpr-2027-scope-and-registration

CVPR 2027

If pursuing CVPR, complete the scope check and prepare all coauthor OpenReview profiles before mandatory paper enrollment.

Deliverable
scope decision, compliant abstract/title, complete coauthor profiles, frozen author list and enrollment receipt.
Plan target
Official milestone date: 11 November 2026 (in 13 days)
Official milestone
CVPR 2027 is in Seattle: workshops/tutorials 20–21 June and the main conference 22–25 June. Mandatory paper enrollment is 10 November 23:59 AoE (11 November 12:59 CET); full paper is 16 November AoE (17 November 12:59 CET); supplement is 23 November AoE (24 November 12:59 CET).
CVPR 2027 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: dh2027-submission-plan

ADHO DH2027

Choose an eligible ADHO format and prepare an evidence-backed outline.

Deliverable
format decision, title, contribution statement, evidence plan and outline.
Plan target
Suggested preparation target: 13 November 2026 (in 15 days)
Official milestone
Official proposal deadline: 20 November 2026 at 23:59 AoE; 21 November 12:59 CET. Use 13 November as an internal completeness target.
ADHO DH2027 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: neurips-2026-poster-video

NeurIPS 2026

Only for an accepted poster, decide whether to prepare the organizer-recommended optional video.

Deliverable
eligibility confirmation and, if useful, uploaded poster video with receipt.
Plan target
Suggested preparation target: 13 November 2026 (in 15 days)
Official milestone
Organizer-recommended, not required, video date: 13 November; no cutoff time or timezone is published.
NeurIPS 2026 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: neurips-2026-poster-topic-session

NeurIPS 2026

Only for an accepted main-conference poster, update the best-fit topic and confirm the session assignment before the organizer checkpoint.

Deliverable
eligibility confirmation, recorded best-fit topic and session assignment.
Plan target
Official milestone date: 16 November 2026 (in 18 days)
Official milestone
Official poster topic/session checkpoint: 15 November AoE; 16 November 12:59 CET Budapest.
NeurIPS 2026 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: webconf-2027-demo-submission

The Web Conference 2027

Prepare the four-page non-anonymous demo paper and stable implemented-system demo or video link.

Deliverable
eligibility confirmation, demonstration package, presenter confirmation, submitted files and receipt.
Plan target
Official milestone date: 17 November 2026 (in 19 days)
Official milestone
Official demo deadline: 16 November 2026 at 23:59 AoE; 17 November 12:59 CET. The call expects an implemented and tested system.
The Web Conference 2027 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: webconf-2027-short-paper

The Web Conference 2027

Only after a timely short-paper abstract, finish the compliant four-page paper using the frozen author list and order.

Deliverable
compliant paper, author/profile check, submitted files and receipt.
Plan target
Official milestone date: 17 November 2026 (in 19 days)
Official milestone
Official research-short paper deadline: 16 November 2026 at 23:59 AoE; 17 November 12:59 CET. A timely short-paper abstract is required.
The Web Conference 2027 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: eddi-2026-attendance-registration

EDDI 2026

If attending, recheck the live registration route and register before the earlier literal interpretation of the anomalous November timezone label.

Deliverable
verified registration boundary, final fee/eligibility record and attendee confirmation if proceeding.
Plan target
Official milestone date: 19 November 2026 (in 21 days)
Official milestone
The official page lists early-bird registration through 19 November 23:59 'CEST' and closure on 26 November 09:59 'CEST,' even though Europe is on CET then. Literal conversions are 19 November 22:59 CET and 26 November 08:59 CET; if Brussels wall time was intended, each is one hour later. Confirm before relying on the final hour. The linked GÉANT checkout presented a human-verification challenge.
EDDI 2026 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: eswc-2027-research-paper-plan

ESWC 2027

Assess the research-track fit and prepare a submission plan for a semantic-web or knowledge-graph contribution.

The official 2027 edition now publishes confirmed dates and live submission milestones.

Deliverable
fit decision, contribution/evaluation outline, author plan and EasyChair readiness record.
Plan target
Suggested preparation target: 20 November 2026 (in 22 days)
Official milestone
ESWC 2027 is in Limassol, 23–27 May. Abstract registration is 10 December 2026 and full paper submission is 17 December 2026, both 23:59 AoE; EasyChair is linked from the official call.
ESWC 2027 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: hri-2027-videos-demos-sdc

HRI 2027 videos/demos and Student Design Competition

Only if an eligible HRI video/demo or Student Design Competition entry is intended, choose the correct call and prepare its distinct submission package.

Deliverable
call and eligibility decision, compliant package, author/profile check and submission receipt if proceeding.
Plan target
Official milestone date: 21 November 2026 (in 23 days)
Official milestone
Official submission date: 20 November 2026 at 23:59 AoE; 21 November 12:59 CET Budapest. These calls are distinct from the closed main-paper route.
HRI 2027 videos/demos and Student Design Competition official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: siggraph-asia-2026-attendance-registration

SIGGRAPH Asia 2026

If attending or presenting, select the correct in-person registration category and record the presenter obligation for any accepted work.

Deliverable
registration decision, category/fee record and conditional presenter checklist.
Plan target
Official milestone date: 30 November 2026 (in 32 days)
Official milestone
SIGGRAPH Asia runs entirely in person in Kuala Lumpur, 1–4 December. Regular pricing ends 30 November 23:59 MYT, equivalent to 16:59 CET. One contributor per accepted technical paper needs Full Access and in-person presentation; promised code/data repositories are due 2 November without a published clock/timezone.
SIGGRAPH Asia 2026 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: webconf-2027-tutorial-proposal

The Web Conference 2027 Tutorials

Reassess whether a justified tutorial with an in-person presenter is worth preparing.

Deliverable
go/no-go decision and, if proceeding, four-page proposal outline, teaser plan and presenter confirmation.
Plan target
Suggested preparation target: 1 December 2026 (in 33 days)
Official milestone
Official deadline: 4 January 2027 at 23:59 AoE. Recheck the organizer-linked portal before submission and do not assume an extension.
The Web Conference 2027 Tutorials official source ↗

Source checked: 25 October 2026

Suggested action

Task ID: acl-2027-arr-readiness

ACL 2027

Reserve the January ARR cycle and prepare author-profile and contributor readiness.

Deliverable
scope decision, timeline, verified metadata and ARR checklist.
Plan target
Suggested preparation target: 4 December 2026 (in 36 days)
Official milestone
Official ARR deadline: 4 January 2027, 23:59 AoE.
ACL 2027 official source ↗

Source checked: 25 October 2026

Needs confirmation

Task ID: dariah-hr-2026-proceedings-followup

DARIAH-HR Digital Humanities & Heritage proceedings

Only if the author actually presented a paper or poster at DHH 2025 or DHH 2026, confirm eligibility and decide whether to prepare the joint-proceedings manuscript.

Deliverable
paper-or-poster presenter eligibility record and, if eligible and proceeding, a compliant manuscript plan and submission receipt.
Plan target
Official milestone date: 17 January 2027 (in 80 days)
Official milestone
The official post-event report invites authors who presented a paper or poster at DHH 2025 or DHH 2026 to submit to the joint proceedings by 17 January 2027; no cutoff clock or timezone is published.
DARIAH-HR Digital Humanities & Heritage proceedings official source ↗

Source checked: 26 October 2026

Suggested action

Task ID: interspeech-2027-main-paper-monitor

Interspeech 2027 main papers

Monitor for the 19 January portal opening and verify the missing deadline clock/timezone and final templates before relying on the 9 February date.

Deliverable
live submission-instructions page, authenticated portal, final requirements and deadline-timezone record.
Plan target
Official milestone date: 9 February 2027 (in 103 days)
Official milestone
The official CFP lists portal opening on 19 January 2027, submission on 9 February, update on 16 February, acceptance on 2 June and camera-ready on 9 June, but no cutoff clock/timezone is published.
Interspeech 2027 main papers official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: tpdl-2027-cfp-monitor

TPDL 2027

Monitor for a finalized CFP, live authenticated submission route, a published workshop-notification date, final camera-ready day, fees, registration and final track instructions.

Deliverable
verified CFP, finalized milestones, submission requirements, track-choice criteria and authenticated submission route.
Plan target
Monitor for an official update
Official milestone
The official series announcement confirms Venice on 27–29 September 2027 and labels workshop proposals on 20 February, abstract registration on 2 April and paper submission on 9 April as tentative. The final CFP, submission route, cutoff timezone, registration and fees remain unverified; do not treat submissions as open.
TPDL 2027 official source ↗

Source checked: 29 October 2026

Suggested action

Task ID: uist-2027-cfp-monitor

UIST 2027

Monitor the official 2027 edition page for conference dates, the CFP, submission routes and registration details.

Deliverable
verified edition dates, CFP, milestone/timezone table, eligibility rules and authenticated submission route.
Plan target
Monitor for an official update
Official milestone
The official placeholder confirms Vienna and says details are coming soon. Conference dates, CFP, submission deadline, submission route and registration remain unpublished and require continued monitoring.
UIST 2027 official source ↗

Source checked: 29 October 2026

Daily briefing · 29 October 2026

Near-term items were verified through 29 October 2026, 07:17:35 CET (06:17:35 UTC). This planner prioritizes the MLSys safety cutoff, today's conservative DHNB finish and the revised AISTATS workshop deadline. AoE means Anywhere on Earth (UTC−12).

Current planner · Conference archive · Dated edition

Conference updates & deadlines

MLSys 2027 paper safety cutoff is 30 October 20:00 CET

Official MLSys pages differ by one hour; use the earlier Budapest cutoff and verify track eligibility, profiles, quotas and AI-use disclosure.

Read findings, evidence and limitations

Official MLSys pages differ by one hour; use the earlier 30 October 20:00 CET safety cutoff. Finish the compliant research-or-industry package, verify track eligibility, profiles, conflicts, quota and AI-use disclosure, and retain the receipt. Official CFP · Official dates

Read the source · MLSys 2027

Finish DHNB 2027 internally today

The organizer extended submissions to 30 October but did not publish a clock or timezone, so 29 October is the conservative preparation target.

Read findings, evidence and limitations

The organizer extended submissions to 30 October but publishes no clock or timezone. Use 29 October as the recommended internal finish, verify the ConfTool route and retain the receipt. Official CFP

Read the source · DHNB 2027

AISTATS workshop proposals close 30 October 22:59 CET

The workshop-specific call records a revised CET deadline and requires a complete three-page proposal, programme, organizer and diversity plan.

Read findings, evidence and limitations

The workshop-specific call records the revised deadline as 30 October 22:59 CET. Submit the complete three-page proposal, programme, organizer-role and diversity package and retain the receipt. Official workshop call

Read the source · AISTATS 2027

Public task board

The board carries unfinished actions forward without treating a passed target as completion. planned is a recommendation; needs confirmation means eligibility, participation or prior submission must be established first. Official deadlines and suggested internal targets are labelled separately.

Active submissions and preparation windows

The 29–30 October cluster

MLSys is open, but its official pages differ by one hour; use 30 October 20:00 CET. DHNB's extended deadline is 30 October with no published clock/timezone, so finish today. AISTATS workshop proposals close 30 October 22:59 CET. The FAccT abstract gate has passed; only timely registered papers may continue to the full-paper stage. MLSys · DHNB · AISTATS · FAccT

Subsequent submission and review routes

  • FAccT 2027: full paper closes 3 November AoE / 4 November 12:59 CET, but only for timely registered papers. Author list and archival choice are frozen.
  • HRI 2027: full-paper rebuttal closes 3 November AoE / 4 November 12:59 CET for existing submissions; videos/demos and the Student Design Competition close 20 November AoE / 21 November 12:59 CET.
  • Interspeech 2027: challenge proposals are dated 3 November and special-session proposals 10 November, but the organizer publishes neither a cutoff clock/timezone nor a submission mechanism on the call pages.
  • CVPR 2027: workshop proposals close 4 November AoE / 5 November 12:59 CET through a now-live official OpenReview route. Main-paper enrollment closes 10 November AoE; full papers 16 November AoE.
  • The Web Conference 2027: long papers are closed. Short-paper abstracts close 9 November AoE; short papers and demos close 16 November AoE. The official-site AoE instants are earlier than conflicting OpenReview metadata and should be used.
  • ADHO DH2027: all principal tracks close 20 November AoE / 21 November 12:59 CET. The organizer-linked ConfTool route could not be inspected, but its authenticity is established by the official ADHO page.

Near-term attendance and accepted-author windows

  • EMNLP 2026, Budapest and online, 24–29 October: today is the final workshop day. Onsite registration is 08:00–16:00 and sessions run 09:00–17:30. Use attendee registration, not closed paper registration. Programme · Registration
  • UIST 2026, Detroit, 2–5 November: registration and onsite registration remain open; no public sold-out/waitlist notice was found. Attending UIST
  • EAAMO 2026, Munich and online, 5–7 November: regular registration is listed “by Nov 4” without a clock/timezone; use 3 November as a safe target. Registration
  • AACL-IJCNLP 2026, Hengqin/China and online, 6–10 November: late attendee registration closes 30 October AoE / 31 October 12:59 CET. Author registration is a separate, already-closed obligation. Registration
  • LoG 2026, Boston, 20–22 November: registration is USD 175 before 6 November and USD 200 after; no cutoff clock/timezone is published, so use 5 November. Registration
  • EDDI 2026, Brussels, 30 November–4 December: the official page mislabels November cutoffs as CEST, creating a one-hour ambiguity. Use the earlier literal conversions and confirm before the final hour. The linked GÉANT checkout presented human verification. Current edition
  • NeurIPS 2026: the workbook's San Diego entry is obsolete. Official sites are Sydney (6–12 December), Atlanta and Paris (9–13 December), plus virtual access. Sydney/Atlanta physical inventory is sold out to general attendees; waitlists remain. Registration
  • SIGGRAPH Asia 2026, Kuala Lumpur, 1–4 December: regular pricing ends 30 November 16:59 CET. One contributor per accepted technical paper needs Full Access and in-person presentation. Registration
  • WACV 2027, Florida, 4–8 January: early pricing ends 3 November 05:59 CET; accepted-author camera-ready and Author registration close 3 November 12:59 CET. These are distinct routes. Registration · Author guide

Next seven days: 29 October–5 November 2026

  • 29 October: finish DHNB internally; finalize MLSys and AISTATS. EMNLP's final-day workshops run in Budapest.
  • 30 October: MLSys safety cutoff 20:00 CET; DHNB date-only deadline; AISTATS workshops 22:59 CET; NeurIPS early-price AoE boundary begins its Budapest conversion.
  • 31 October 12:59 CET: AACL late attendee registration and WSDM Industry Day talk proposals close.
  • 1 November 12:59 CET: AAAI-27 main-track feedback window closes for eligible Phase-2 papers.
  • 2 November: prepare WACV early registration and author obligations; UIST workshops begin.
  • 3 November: WACV early pricing ends at 05:59 CET and author obligations at 12:59 CET; Interspeech challenge proposal date has no published clock/timezone; use an early internal finish.
  • 4 November 12:59 CET: FAccT full paper and HRI rebuttal close for eligible existing submissions.
  • 5 November 12:59 CET: CVPR workshop proposals close through the official OpenReview route; ICLR and CHI review stages begin for existing submissions.

30-day preparation horizon

  • 5–10 November: LoG safe early-rate target; EACL SRW mentorship; Web short-paper abstract; Interspeech special-session proposal.
  • 11–18 November: CVPR enrollment/full-paper sequence; WSDM Doctoral Consortium and short papers; Web short/demo papers; ICLR response work; ARR reviews and response preparation.
  • 19–24 November: EDDI conservative early-rate boundary; DH2027 and HRI special-track deadlines; CVPR supplementary material.
  • 25–28 November: FAccT reviewer-service deadline if applicable; verify EDDI's anomalous timezone label before registration closure; prepare December ESWC, DH Benelux and MDTT packages.

Monitoring — active and unresolved watchlist items

This edition screened all 80 maintained conferences. Priority, near-term, attendance, conflict and assigned rotated-future sources were reopened on 29 October where accessible; other tasks retain their structured verified_on date.

  • TPDL 2027: San Servolo Island, Venice, 27–29 September. The official series labels workshop proposals on 20 February, abstract registration on 2 April and paper submission on 9 April as tentative. The final CFP, submission route, cutoff timezone, registration and fees remain unverified; do not treat submissions as open. Official series announcement
  • SIGIR 2027: San Jose is confirmed, but official pages conflict between 18 and 19 July as the start. The 14/21 January paper dates are explicitly proposed and OpenReview remains unavailable. Full-paper call
  • UIST 2027: the official placeholder confirms Vienna and says details are coming soon. Conference dates, CFP, submission deadline, submission route and registration remain unpublished. Official edition
  • ACL 2027: Kyoto, 17–22 August; the main-paper ARR date is 4 January 2027 AoE. Later milestones remain TBA. COLING and NAACL October ARR submissions are closed; both publish a 23 December commitment deadline. ACL main call · COLING main call · NAACL main call
  • DARIAH 2027: 25–27 May in Aranjuez is now confirmed; theme and CFP remain pending. CLARIN 2027: the canonical CLARIN page still lacks a 2027 edition; Malmö 28–30 September appears only in affiliated-node evidence. DARIAH save-the-date · CLARIN conference page · Affiliated-node report
  • ESWC 2027: Limassol, 23–27 May; abstract/full paper deadlines are 10/17 December AoE and EasyChair is live. Official call
  • Other future conflicts: ICCV gives 3–7 versus 2–8 October on official surfaces. The official CIKM series confirms Sydney without exact dates, while ACM SIGWEB lists 25–29 October; retain the dates as provisional pending an edition site. AKBC says 18 or 19 August; K-CAP has no official 2027 edition. These remain monitors, not confirmed deadlines. ICCV · CIKM series · SIGWEB CIKM listing · AKBC · K-CAP

Full watchlist disposition

The maintained workbook contains 80 conferences. Organizer sources, not workbook planning labels, determine current status.

  • 2026 editions screened (34): AAAI-26; SaTML 2026; EACL 2026; HRI 2026; CHI 2026; ICLR 2026; ICASSP 2026; LREC 2026; CVPR 2026; FORC 2026; ICoM 2026; DIS 2026; FAccT 2026; The ACM Web Conference 2026; ACL 2026; ICML 2026; SIGGRAPH 2026; SIGIR 2026; KDD 2026; IJCAI-ECAI 2026; TPDL 2026; Interspeech 2026; CSCW 2026; AIES 2026; EMNLP 2026; UIST 2026; EAAMO 2026; AACL-IJCNLP 2026; SIGGRAPH Asia 2026; NeurIPS 2026; LoG 2026; CLARIN Annual Conference 2026; DARIAH-HR Digital Humanities & Heritage 2026; EDDI 2026. Historical submission routes were not reopened unless an attendance, author-preparation or outcome action remains current.
  • 2027 and cross-year rows screened (46): WACV 2027; IUI 2027; AAAI 2027; HRI 2027; EACL 2027 SRW; ICLR 2027; CHI 2027; AISTATS 2027; MLSys 2027; ESWC 2027; The ACM Web Conference 2027; CVPR 2027; ACL 2027; SIGIR 2027; UAI 2027; KDD 2027; ECML PKDD 2027; TPDL 2027; SEMANTiCS 2027; ICCV 2027; COLM 2027; ISWC 2027; AIES 2027; FAccT 2027; Interspeech 2027; UIST 2027; EMNLP 2027; CIKM 2027; AKBC 2027; K-CAP 2027; ICML 2027; NeurIPS 2027; WSDM 2027; ACDSA 2027; COLING 2027; NAACL 2027; LoG 2027; IJCKG 2027; QDLCA 2027; DARIAH Annual Event 2027; CLARIN Annual Conference 2027; DHNB 2027; 9th Conference on Digital History and Digital Humanities; ADHO DH2027; DH Benelux 2027; MDTT 2027. Every active future row was either freshly checked in the assigned rotation or retained with its earlier structured verification date and next checkpoint.

Changes since the 28 October edition

  • FAccT's abstract gate is now closed: only timely registered papers may use the 4 November Budapest full-paper deadline.
  • HRI rebuttal is now the active main-paper milestone: action remains conditional on an existing eligible submission.
  • CVPR 2027 is materially updated: Seattle dates are 20–21 June workshops/tutorials and 22–25 June main conference; the workshop OpenReview route is now live.
  • NeurIPS workbook location is obsolete: official 2026 sites are Sydney, Atlanta and Paris, not San Diego; Sydney and Atlanta general physical inventory is sold out with waitlists.
  • WSDM Industry Day is a newly identified open route: it closes 30 October AoE and is distinct from the closed research-paper track.
  • ESWC 2027 now has confirmed dates and live milestones: Limassol, 23–27 May, with 10/17 December AoE abstract/full-paper deadlines.
  • No extension was verified today for MLSys, DHNB or AISTATS. Existing source conflicts and missing clocks remain disclosed.

Coverage and limitations

The current Drive workbook defines the watchlist, not official deadline evidence. Official organizer, society, university and organizer-linked registration/submission sources remain authoritative. Mutable priority, near-term, attendance, conflict and assigned rotated-future sources were rechecked on 29 October where accessible; tasks not reopened today retain their earlier structured verified_on date.

Dynamic portal metadata, authenticated submission state, transactional inventory, private registration state and payment outcomes were not inferred. ConfTool and several payment/registration portals could not be inspected; the EDDI-linked GÉANT page presented human verification. Some organizers omit cutoff clocks, timezones, fees or live portal links. No submission, acceptance, attendance, registration, presentation or task completion is assumed without evidence.

Verification: two independent source checks passed; conference details remain subject to official organizer updates.

Latest Conferences briefing