Daily briefings
ATLAS

Research. Knowledge. Opportunity.
A clearer view of what comes next.

Academic conference deadlines and preparation — 6 November 2026

Archived edition. Findings, availability and deadlines reflect this report’s date; consult current original sources before acting.

Today’s three priority actions

  1. AISTATS 2027 workshops — submit only if a complete proposal is already viable. Finish the three-page proposal, programme, organizer roles, speaker status and diversity commitment, then use the official OpenReview submission link. The deadline is today at 22:59 CET; 15 hours 37 minutes remained at the run start. Deliverable: compliant proposal and receipt. Official workshop call
  2. EACL 2027 SRW mentorship — use only for an eligible student-led draft. Submit the anonymized ACL-format draft through the optional mentorship route before the CFP boundary of 7 November 12:59 CET; about 1 day 5 hours 37 minutes remained. Deliverable: eligibility record, anonymized draft and receipt. Official SRW call
  3. NeurIPS 2026 childcare — reserve today if the registered-attendee conditions apply. The Sydney/Atlanta cards give a date-only 6 November boundary, earlier than the aggregate exact timestamp. Deliverable: registration and location-specific reservation/fee record. Official childcare page

Conference planner

Daily activities & tasks

Plan verified for . Preparation targets are recommendations; official deadlines are labelled separately.

Today / needs review

PriorityNeeds confirmation

Task ID: aistats-2027-workshop-proposal-decision

AISTATS 2027 Workshops

Only if a viable workshop team and programme already exist, finalize the three-page proposal and submit through the official OpenReview route.

The workshop-specific call closes today; it supersedes an obsolete date on the main CFP.

Deliverable
proposal, programme, organizer roles and bios, speaker/contact status, diversity commitment and submission receipt.
Plan target
Official milestone date: 6 November 2026 (today)
Official milestone
The modified official workshop deadline is 6 November 2026 at 22:59 CET; 15 hours 37 minutes remained at the run start. The proposal is three pages excluding references.
AISTATS 2027 Workshops official source ↗

Source checked: 6 November 2026

PriorityNeeds confirmation

Task ID: neurips-2026-childcare-reservation

NeurIPS 2026

Only for a registered attendee needing Sydney or Atlanta childcare, reserve immediately and retain the site/fee confirmation.

The location cards give a date-only 6 November boundary despite a later exact timestamp on the dates page.

Deliverable
registration confirmation, location-specific childcare reservation and fee/deadline record.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
Sydney and Atlanta cards say 6 November without a clock; the dates page gives 7 November 01:00 UTC, equivalent to 7 November 02:00 CET. Use 6 November local time conservatively. Paris uses personal emailed links.
NeurIPS 2026 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: aacl-ijcnlp-2026-attendance-record

AACL-IJCNLP 2026

If attending today, use the live UTC+8 programme and finalize the remaining session/networking plan; if presenting, verify uploaded materials and the published presenter list.

The hybrid conference is live today in Hengqin and online.

Deliverable
attendance/mode decision, registration record if proceeding, selected sessions and conditional presenter checklist.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
AACL-IJCNLP runs 6–10 November in Hengqin and online; programme times use UTC+8. Onsite/virtual registration is advertised for 1–10 November. Author linkage and 2 November material uploads are separate passed obligations.
AACL-IJCNLP 2026 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: cvpr-2027-workshop-proposal

CVPR 2027 Workshops

Record whether a compliant proposal was submitted before closure; otherwise document that the workshop route passed without inferring completion.

The workshop-proposal deadline passed yesterday; the main-paper route remains separate.

Deliverable
submission/outcome record, final proposal and receipt if applicable, or documented closure.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
Workshop proposals were due 4 November 2026 at 23:59 AoE, equivalent to 5 November 12:59 CET. The route has passed; no extension or completion is inferred.
CVPR 2027 Workshops official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: eaamo-2026-regular-registration

EAAMO 2026

If attending EAAMO, use the remaining onsite-rate route and today's programme; if presenting, separately confirm the required in-person presenter.

EAAMO is on Day 2 in Munich; onsite rates remain advertised through 7 November.

Deliverable
attendance/mode decision, category/fee record, receipt if proceeding, and conditional presenter confirmation.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
EAAMO runs 5–7 November in Munich with paid Zoom access. Regular registration ended 4 November; onsite rates remain through 7 November. Main accepted-paper presenters must attend in person.
EAAMO 2026 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: log-2026-attendance-registration

LoG 2026

If attending, verify the checkout price now; if presenting, confirm the required in-person author and poster/oral obligations.

The lower-rate language says 'before 6 November' without a clock or timezone and may already have expired.

Deliverable
attendance decision, live fee record, receipt if proceeding and conditional presenter checklist.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
LoG is in person in Boston, 20–22 November. USD 175 applied 'before November 6' and USD 200 afterward, without a clock/timezone; verify the live checkout price. Accepted works require an in-person author absent approved exception.
LoG 2026 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: mdtt-2027-terminology-paper-scope

MDTT 2027

Scope a focused terminology/NLP paper and confirm author and portal readiness.

Deliverable
fit decision, contribution statement, evidence plan, outline and CMT readiness check.
Plan target
Suggested preparation target: 6 November 2026 (today)
Official milestone
Provisional organizer submission date: 18 December 2026, 23:59 AoE; CMT is live, while registration dates, fees and payment are unpublished.
MDTT 2027 official source ↗

Source checked: 1 November 2026

Needs confirmation

Task ID: facct-2027-full-paper

ACM FAccT 2027

Record whether an eligible full paper was filed before closure; otherwise document the route outcome without inferring completion.

The official full-paper deadline passed yesterday; only timely registered abstracts were eligible.

Deliverable
eligibility/outcome record, final files and receipt if applicable, or documented closure.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
FAccT full papers were due 3 November 2026 at 23:59 AoE, equivalent to 4 November 12:59 CET. The deadline has passed; no extension was verified and completion is not inferred.
ACM FAccT 2027 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: hri-2027-main-review-readiness

HRI 2027 main papers

For a valid earlier full-paper submission, record whether the rebuttal was filed before closure and retain the final response and receipt; otherwise document the outcome.

The full-paper rebuttal deadline passed yesterday.

Deliverable
submission confirmation, rebuttal outcome, final response and receipt if applicable.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
HRI full-paper rebuttals were due 3 November 2026 at 23:59 AoE, equivalent to 4 November 12:59 CET. The route applied only to a valid earlier full-paper submission; completion is not inferred.
HRI 2027 main papers official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: neurips-2026-attendance-registration

NeurIPS 2026

If attendance is still intended, verify current location inventory through the live form before paying and keep accepted-paper author obligations separate from attendee access.

Physical inventory is dynamic and waitlist releases may change it.

Deliverable
site/mode decision, live inventory record and registration receipt if proceeding.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
Sydney/Atlanta physical inventory and waitlists are dynamic and have shown sold-out or selectable states across live checks; Virtual Only has remained advertised. Each accepted paper needs a qualifying author registration and an assigned-site presenter or approved substitute; virtual attendee access is not evidence that the author obligation is satisfied.
NeurIPS 2026 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: neurips-2026-sydney-poster-print

NeurIPS 2026

Only for a Sydney-assigned accepted poster, record the advance-print outcome and retain the order receipt or alternative production plan.

The conservative advance-order cutoff passed yesterday; the later standard-order route should be checked separately.

Deliverable
acceptance/site assignment, print outcome and receipt or documented alternative production plan.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
The organizer listed the advance-print deadline as 4 November at 23:00 AEST. The deliberately earlier safety conversion was 13:00 CET because Sydney observes AEDT. That advance deadline has passed; completion is not inferred.
NeurIPS 2026 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: neurips-2026-refund-check

NeurIPS 2026

For an existing unused registration, record whether cancellation was completed before the conflicting official boundaries; otherwise treat the public refund route as passed.

The latest published refund boundaries have passed or are no longer safe to rely on.

Deliverable
registration confirmation and cancellation/refund outcome record if applicable.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
Official pages conflicted between 'before 4 November AoE', 4 November AoE and a looser 5 November label. At this run time the safe cancellation window has passed; do not infer a refund route or completion.
NeurIPS 2026 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: uist-2026-attendance-lodging

UIST 2026

If registered, execute the final UIST session/networking plan and prepare any confirmed presentation to the organizer's slot format.

UIST ends today in Detroit.

Deliverable
attendance confirmation, selected final-day sessions, networking follow-ups and conditional presentation checklist.
Plan target
Suggested preparation target: 5 November 2026 (1 day ago — review status)
Official milestone
UIST 2026 is in Detroit through 5 November; main sessions run 3–5 November. Registration and organizer-linked checkout remained advertised at verification. No participation is inferred.
UIST 2026 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: aaai-2027-aia-author-feedback

AAAI-27 AI Alignment

Only for an existing AAAI AI Alignment paper, record whether an eligible response was filed before closure; otherwise document the outcome without inferring completion.

The window passed on 3 November; completion is not inferred.

Deliverable
submission/eligibility confirmation, response receipt if applicable, or documented outcome/ineligibility.
Plan target
Suggested preparation target: 4 November 2026 (2 days ago — review status)
Official milestone
The AI Alignment author-feedback window ended 2 November 2026 at 23:59 AoE, equivalent to 3 November 12:59 CET. It applies only to an existing AI Alignment submission; current transactional eligibility and completion are not inferred.
AAAI-27 AI Alignment official source ↗

Source checked: 4 November 2026

Needs confirmation

Task ID: aacl-ijcnlp-2026-presentation-material-outcome

AACL-IJCNLP 2026

Only for a confirmed accepted presentation, record whether the materials required for its category were uploaded; if not, follow authenticated organizer recovery instructions.

The public presenter-material date has passed and completion is not inferred.

Deliverable
acceptance/category confirmation, upload outcome and receipts, or documented recovery status.
Plan target
Suggested preparation target: 4 November 2026 (2 days ago — review status)
Official milestone
Poster PDFs and slides for the listed main, Findings, demo and SRW presentation categories were due 2 November 2026. A prerecorded video was required for main, Findings, demo and SRW oral presentations, but optional for SRW posters and workshop papers. Local next-day poster delivery is advertised for orders before 14:00 UTC+8, equivalent to 07:00 CET; use only authenticated recovery instructions after the passed upload date.
AACL-IJCNLP 2026 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: interspeech-2027-challenge-proposal

Interspeech 2027 Challenges

Record whether a challenge proposal was filed before the date-only deadline; otherwise keep the route unresolved unless the organizers publish an authenticated recovery mechanism.

The official date passed, but the page still omits a cutoff clock, timezone and submission mechanism while the homepage labels the call open.

Deliverable
outcome record, complete proposal and receipt if applicable, or documented route/status gap.
Plan target
Suggested preparation target: 4 November 2026 (2 days ago — review status)
Official milestone
The official challenge date was 3 November 2026, with no time, timezone or submission route. The homepage still labels the call open. Do not treat the questions contact as a submission mechanism or infer an extension.
Interspeech 2027 Challenges official source ↗

Source checked: 4 November 2026

Needs confirmation

Task ID: wacv-2027-camera-ready

WACV 2027

Record whether an accepted Round 1 or Round 2 paper met the camera-ready and qualifying Author-registration deadline; if not, follow only authenticated organizer recovery instructions.

The official AoE deadline has passed; completion is not inferred and the 17 November warning is not an extension.

Deliverable
acceptance and outcome record, final file, qualifying paper-linked Author registration and receipts if applicable, or documented recovery status.
Plan target
Suggested preparation target: 4 November 2026 (2 days ago — review status)
Official milestone
Camera-ready papers and qualifying Author registration were due 2 November 2026 AoE, equivalent to 3 November 12:59 CET. The author guide's 17 November omission warning is an audit checkpoint, not a deadline extension. Virtual or workshop-only registration does not cover a proceedings paper.
WACV 2027 official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: aaai-2027-author-feedback

AAAI-27

Record the Phase-2 author-feedback outcome if eligible; otherwise retain the documented ineligibility and close this route.

The updated AAAI main-track feedback window has passed and only Phase-2 papers qualified.

Deliverable
eligibility/outcome record and response receipt if applicable, or documented closure.
Plan target
Suggested preparation target: 3 November 2026 (3 days ago — review status)
Official milestone
The updated Phase-2 feedback window ended on 1 November 2026 at 12:59 CET in Budapest. No extension was verified as of 3 November 06:38 CET.
AAAI-27 official source ↗

Source checked: 3 November 2026

Needs confirmation

Task ID: siggraph-asia-2026-code-data-repository

SIGGRAPH Asia 2026 Technical Papers

Only for an accepted technical paper that promised code or data, record whether the repository obligation was completed before the date-only deadline and follow any authenticated organizer recovery instructions.

The organizer's promised code/data repository date passed without a published cutoff clock or timezone; completion is not inferred.

Deliverable
acceptance and repository-obligation confirmation, outcome record, archived repository and receipt if applicable.
Plan target
Suggested preparation target: 3 November 2026 (3 days ago — review status)
Official milestone
Promised code/data repositories for accepted technical papers were due 2 November 2026. The organizer did not publish a cutoff clock or timezone. Record the outcome immediately and use any authenticated organizer instructions if a conditional obligation remains. This applies only to an accepted paper whose submission promised code or data.
SIGGRAPH Asia 2026 Technical Papers official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: dhnb-2027-track-abstract-draft

DHNB 2027

Record whether an eligible DHNB proposal was submitted before the date-only 30 October closure; otherwise close the route unless the organizer posts an extension.

Deliverable
outcome record and receipt/final proposal if applicable, or documented closure.
Plan target
Suggested preparation target: 2 November 2026 (4 days ago — review status)
Official milestone
The extended organizer deadline was 30 October 2026 without a published clock or timezone. It has passed in Budapest; no further extension was verified as of 31 October 06:49 CET.
DHNB 2027 official source ↗

Source checked: 31 October 2026

Needs confirmation

Task ID: qdlca-2027-preconference-workshop-eoi

QDLCA27 pre-conference research-infrastructure workshop

Record whether the workshop expression of interest was filed before the date-only closure; otherwise monitor only for an organizer-issued late route.

The organizer's date-only 31 October boundary has passed; completion and capacity are unknown.

Deliverable
outcome record and form receipt if applicable, or documented closure.
Plan target
Suggested preparation target: 2 November 2026 (4 days ago — review status)
Official milestone
King's College London gave 31 October 2026 without a clock or timezone. That date has passed in Budapest; no extension or late route was verified as of 1 November 07:05 CET.
QDLCA27 pre-conference research-infrastructure workshop official source ↗

Source checked: 1 November 2026

Needs confirmation

Task ID: wsdm-2027-industry-day-talk

WSDM 2027 Industry Day

Record whether a qualifying deployment-focused proposal was filed before closure; otherwise close the Industry Day route unless the organizer announces an extension.

The official Industry Day cutoff has passed; completion is unknown.

Deliverable
outcome record and receipt/final proposal if applicable, or documented closure.
Plan target
Suggested preparation target: 2 November 2026 (4 days ago — review status)
Official milestone
The Industry Day deadline passed on 31 October 2026 at 12:59 CET in Budapest. No extension was verified as of 1 November 07:05 CET, and submission is not inferred.
WSDM 2027 Industry Day official source ↗

Source checked: 1 November 2026

Needs confirmation

Task ID: mlsys-2027-openreview-paper-readiness

MLSys 2027

Record whether an eligible research- or industry-track package was submitted before the official cutoff; otherwise close the route unless the organizer announces an extension.

Deliverable
outcome record, submission receipt and final files if applicable, or documented closure.
Plan target
Suggested preparation target: 31 October 2026 (6 days ago — review status)
Official milestone
The paper deadline was 30 October 2026 at 21:00 UTC / 14:00 PDT, equivalent to 22:00 CET in Budapest. Both official pages agree. It had passed by verification; no extension was found, and submission is not inferred.
MLSys 2027 official source ↗

Source checked: 31 October 2026

Needs confirmation

Task ID: emnlp-2026-attendance-decision

EMNLP 2026

Record the attendance outcome and, if registered, use the Whova-to-Underline route for missed-session recordings, posters, slides and asynchronous author discussion.

Deliverable
attendance/outcome record, selected follow-up materials and networking follow-up list if applicable.
Plan target
Suggested preparation target: 30 October 2026 (7 days ago — review status)
Official milestone
EMNLP 2026 ended on 29 October. Late in-person registration ended on 23 October; late virtual and onsite registration ended on 29 October. The page still says 'Registration is now open', so current transactional availability is unresolved and must not be treated as an active repair route for passed paper-registration obligations. Public proceedings are live in ACL Anthology; registered participants retain access to conference materials through Whova and Underline.
EMNLP 2026 official source ↗

Source checked: 3 November 2026

Needs confirmation

Task ID: facct-2027-abstract-package

ACM FAccT 2027

Record whether the mandatory paper-registration fields were submitted before closure; if not, close the paper route. Do not infer completion from the passed deadline.

Deliverable
outcome record and registration receipt if applicable.
Plan target
Suggested preparation target: 29 October 2026 (8 days ago — review status)
Official milestone
The mandatory abstract registration passed on 27 October 2026 at 23:59 AoE, equivalent to 28 October 12:59 CET in Budapest. The author list and archival choice froze at registration; only timely registered papers may continue to full-paper upload.
ACM FAccT 2027 official source ↗

Source checked: 29 October 2026

Needs confirmation

Task ID: webconf-2027-full-paper

The Web Conference 2027

Record whether the full paper was submitted before the closed deadline; if no timely abstract existed, close the long-paper route.

Deliverable
outcome record and submission receipt/final files if applicable.
Plan target
Suggested preparation target: 28 October 2026 (9 days ago — review status)
Official milestone
The full-paper deadline passed on 26 October 2026 at 12:59 CET in Budapest. Only timely registered long-paper abstracts could proceed; no extension was promised.
The Web Conference 2027 official source ↗

Source checked: 28 October 2026

Suggested action

Task ID: dh-benelux-2027-proposal-plan

DH Benelux 2027

Select a proposal format and prepare an anonymized outline and bibliography.

Deliverable
format decision, outline and evidence checklist.
Plan target
Suggested preparation target: 26 October 2026 (11 days ago — review status)
Official milestone
Official deadline: 7 December 2026, 23:59 CET; the submission portal remains forthcoming.
DH Benelux 2027 official source ↗

Source checked: 1 November 2026

Needs confirmation

Task ID: uist-2026-childcare-grant

UIST 2026

Treat the childcare-grant deadline as passed; only record a late exception if the organizer form explicitly accepts one.

Deliverable
late-route status record and, only if accepted by the organizer form, childcare-grant application receipt.
Plan target
Suggested preparation target: 22 October 2026 (15 days ago — review status)
Official milestone
The organizer required applications before 23 October. That window has passed; no late acceptance is assumed unless the organizer explicitly confirms an exception.
UIST 2026 official source ↗

Source checked: 28 October 2026

Needs confirmation

Task ID: acdsa-2027-submission-outcome

ACDSA 2027

Record whether an eligible paper was submitted before the extended 12 October closure.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 21 October 2026 (16 days ago — review status)
Official milestone
Extended submission deadline passed 12 October 2026; no timezone was published. 2027 IEEE Xplore or Scopus inclusion is not guaranteed.
ACDSA 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: iui-2027-doctoral-consortium

ACM IUI 2027 Doctoral Consortium

Record whether an eligible application, PCS submission and separate adviser letter were completed before closure; do not infer completion.

Deliverable
outcome record and receipts if applicable.
Plan target
Suggested preparation target: 21 October 2026 (16 days ago — review status)
Official milestone
The official page gives 19 October 2026 for both the PCS submission and separate adviser letter; no cutoff clock or timezone is published.
ACM IUI 2027 Doctoral Consortium official source ↗

Source checked: 25 October 2026

Needs confirmation

Task ID: coling-naacl-2027-author-profile-audit

COLING 2027 / NAACL 2027

For any October ARR paper, record whether every author’s functional OpenReview profile and ORCID were completed within the one-week grace period and remediate any gap promptly.

Deliverable
compliance/outcome record and earlier-form confirmations.
Plan target
Suggested preparation target: 21 October 2026 (16 days ago — review status)
Official milestone
The one-week point after 12 October 23:59 AoE passed on 20 October 13:59 CEST.
COLING 2027 / NAACL 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: hri-2027-pioneers-eligibility

HRI Pioneers 2027

Record whether an eligible student-led HRI application was filed before closure.

Deliverable
outcome record and receipt if applicable.
Plan target
Suggested preparation target: 21 October 2026 (16 days ago — review status)
Official milestone
Official deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
HRI Pioneers 2027 official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: webconf-2027-research-abstract

The Web Conference 2027 long-paper route

Record whether a valid long-paper abstract was registered before closure; otherwise close the long-paper route.

Deliverable
outcome and receipt if applicable.
Plan target
Suggested preparation target: 21 October 2026 (16 days ago — review status)
Official milestone
Official abstract deadline passed 18 October 23:59 AoE; 19 October 13:59 CEST Budapest.
The Web Conference 2027 long-paper route official source ↗

Source checked: 21 October 2026

Needs confirmation

Task ID: aacl-ijcnlp-2026-hotel-decision

AACL-IJCNLP 2026

Record whether official lodging was booked before the closed cutoff; if attendance remains intended, compare ordinary lodging without assuming organizer inventory.

Deliverable
lodging-outcome record and a current ordinary-lodging option if proceeding.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
Official hotel deadline passed 18 October 23:59 Beijing time.
AACL-IJCNLP 2026 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: aistats-2027-paper-eligibility-finalize

AISTATS 2027

Record whether an eligible main-track paper was submitted before the closed deadline.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
Official deadline passed 6 October 23:59 AoE.
AISTATS 2027 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: coling-naacl-2027-arr-paper-finalize

COLING 2027 / NAACL 2027

Record whether the October ARR paper and post-submission forms were completed; preserve any receipt and final files.

Deliverable
outcome record and, if applicable, receipt, final PDF and form confirmations.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
The submission and 48-hour form windows have closed.
COLING 2027 / NAACL 2027 official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: eacl-2027-main-commitment

EACL 2027 main conference

Record whether an eligible reviewed ARR paper was committed before closure.

Deliverable
outcome record and, if applicable, confirmation.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
Official deadline passed 11 October 23:59 AoE.
EACL 2027 main conference official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: hri-2027-special-tracks-decision

HRI 2027 Industry White Papers

Record whether an eligible Industry White Paper was submitted before closure.

Deliverable
outcome record and, if applicable, receipt and final files.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
Official deadline passed 10 October 23:59 AoE.
HRI 2027 Industry White Papers official source ↗

Source checked: 20 October 2026

Needs confirmation

Task ID: webconf-2027-tot-nomination

The Web Conference 2027 Test of Time Award

Record whether an eligible Test of Time nomination was filed before closure.

Deliverable
outcome record and, if applicable, nomination receipt.
Plan target
Suggested preparation target: 20 October 2026 (17 days ago — review status)
Official milestone
Official deadline passed 14 October 23:59 AoE.
The Web Conference 2027 Test of Time Award official source ↗

Source checked: 20 October 2026

Next 7 days

PriorityNeeds confirmation

Task ID: eacl-2027-srw-mentorship-eligibility

EACL 2027 Student Research Workshop

If the first author is an eligible student and optional writing mentorship is useful, submit the anonymized ACL-format draft before the CFP boundary.

The optional mentorship route closes tomorrow and is separate from final paper submission.

Deliverable
student eligibility record, anonymized draft, portal submission and receipt.
Plan target
Official milestone date: 7 November 2026 (in 1 day)
Official milestone
The CFP gives 6 November 2026 at 23:59 AoE, equivalent to 7 November 12:59 CET; about 1 day 5 hours 37 minutes remained. The portal displays 13:00 CET, so use the earlier 12:59 CET boundary.
EACL 2027 Student Research Workshop official source ↗

Source checked: 6 November 2026

PriorityNeeds confirmation

Task ID: neurips-2026-camera-ready-conflict

NeurIPS 2026 main conference and Evaluations & Datasets

Only for an accepted paper, check authenticated MyStuff/OpenReview immediately; retain the final file/status evidence and contact technical support if the stage is blocked.

The nominal deadline is tomorrow, but the public poster page says the camera-ready stage is already closed.

Deliverable
acceptance confirmation, authenticated route/status record, final camera-ready file and receipt or support record.
Plan target
Official milestone date: 7 November 2026 (in 1 day)
Official milestone
The official dates page gives 6 November 2026 AoE, equivalent to 7 November 12:59 CET. The Poster Instructions page says camera-ready is currently closed and updates are disallowed; do not describe the route as publicly open.
NeurIPS 2026 main conference and Evaluations & Datasets official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: wacv-2027-attendee-registration

WACV 2027

If attending, choose the attendee category and mode before the early-rate cutoff; keep this separate from overdue accepted-paper Author registration.

Early attendee pricing closes in under two days.

Deliverable
attendance/mode decision, category and fee record, and registration receipt if proceeding.
Plan target
Official milestone date: 8 November 2026 (in 2 days)
Official milestone
Early attendee pricing ends 7 November 2026 at 23:59 ET, equivalent to 8 November 05:59 CET. Accepted papers require a separate in-person Author registration even for virtual presentation.
WACV 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: interspeech-2027-special-session-proposal

Interspeech 2027 Special Sessions

Only for a ready special-session concept, finish the scientific scope and team while obtaining the missing official route, clock and timezone.

The organizer lists a 10 November date but still omits the submission mechanism and cutoff time.

Deliverable
session concept, organizers, rationale, topic plan, verified route and receipt if submitted.
Plan target
Suggested preparation target: 10 November 2026 (in 4 days)
Official milestone
The official calls page lists 10 November 2026 for Special Session proposals but publishes no clock, timezone or submission mechanism. Do not treat a questions address as the submission route.
Interspeech 2027 Special Sessions official source ↗

Source checked: 5 November 2026

Needs confirmation

Task ID: webconf-2027-short-abstract

The Web Conference 2027

Only for a viable short paper, register the complete abstract, final author list/order, track relevance and current OpenReview profiles before the official-site cutoff.

The mandatory abstract deadline is within four days and precedes the paper deadline.

Deliverable
fit decision, final abstract, frozen author list/order, OpenReview registration and receipt.
Plan target
Official milestone date: 10 November 2026 (in 4 days)
Official milestone
The official deadline is 9 November 2026 at 23:59 AoE, equivalent to 10 November 12:59 CET. OpenReview displays 14:00 CET; use the earlier official boundary.
The Web Conference 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: cvpr-2027-scope-and-registration

CVPR 2027

Only for a viable CVPR paper, complete all author profiles and mandatory paper enrollment before proceeding to the anonymous manuscript and supplement.

Mandatory enrollment closes within five days and the organizer says there is no extension.

Deliverable
scope decision, complete author profiles, paper enrollment, compliant manuscript and receipts if proceeding.
Plan target
Official milestone date: 11 November 2026 (in 5 days)
Official milestone
Enrollment closes 10 November AoE (11 November 12:59 CET), papers 16 November AoE (17 November 12:59 CET), and supplements 23 November AoE (24 November 12:59 CET). Dates are fixed with no extension.
CVPR 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: neurips-2026-poster-video

NeurIPS 2026

Only for an accepted poster, decide whether to prepare the organizer-recommended optional video.

Deliverable
eligibility confirmation and, if useful, uploaded poster video with receipt.
Plan target
Suggested preparation target: 13 November 2026 (in 7 days)
Official milestone
Organizer-recommended, not required, video date: 13 November; no cutoff time or timezone is published.
NeurIPS 2026 official source ↗

Source checked: 3 November 2026

Later & monitor

Needs confirmation

Task ID: naacl-2027-industry-track

NAACL 2027 Industry Track

Only for a viable paper about a deployed NLP or speech system, use the extended Industry Track window to finish the six-page anonymous package and submit through organizer-linked OpenReview.

The extended official window remains open.

Deliverable
track-fit decision, compliant anonymous paper with limitations, author/policy checklist, OpenReview submission and receipt if proceeding.
Plan target
Official milestone date: 14 November 2026 (in 8 days)
Official milestone
The extended Industry Track deadline is 13 November 2026 at 23:59 AoE, equivalent to 14 November 12:59 CET. Organizer-linked OpenReview is live. The track is for deployed NLP and speech systems and does not use ARR.
NAACL 2027 Industry Track official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: kdd-2027-first-cycle-notification

KDD 2027 Research Track

Only for an existing Cycle 1 submission, monitor the authenticated OpenReview record and document the notification outcome; do not treat this as a new submission route.

The Cycle 1 notification date is within ten days.

Deliverable
submission confirmation, notification outcome and next-step record if applicable.
Plan target
Official milestone date: 15 November 2026 (in 9 days)
Official milestone
The official Research Track page gives notification on 14 November 2026 and states that all deadlines are end-of-day AoE, so the Budapest outer bound is 15 November 12:59 CET. Actual release may occur earlier.
KDD 2027 Research Track official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: neurips-2026-poster-topic-session

NeurIPS 2026

Only for an accepted main-conference poster, update the best-fit topic and confirm the session assignment before the organizer checkpoint.

Deliverable
eligibility confirmation, recorded best-fit topic and session assignment.
Plan target
Official milestone date: 16 November 2026 (in 10 days)
Official milestone
Official poster topic/session checkpoint: 15 November AoE; 16 November 12:59 CET Budapest.
NeurIPS 2026 official source ↗

Source checked: 3 November 2026

Needs confirmation

Task ID: webconf-2027-demo-submission

The Web Conference 2027

Prepare the four-page non-anonymous demo paper and stable implemented-system demo or video link.

Deliverable
eligibility confirmation, demonstration package, presenter confirmation, submitted files and receipt.
Plan target
Official milestone date: 17 November 2026 (in 11 days)
Official milestone
The distinct non-anonymous demo route closes 16 November 2026 at 23:59 AoE, equivalent to 17 November 12:59 CET. Demo eligibility and artefact requirements must be checked separately from short papers.
The Web Conference 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: webconf-2027-short-paper

The Web Conference 2027

Only after a timely short-paper abstract, finish the compliant four-page paper using the frozen author list and order.

Deliverable
compliant paper, author/profile check, submitted files and receipt.
Plan target
Official milestone date: 17 November 2026 (in 11 days)
Official milestone
Only a timely registered short-paper abstract may continue. The paper deadline is 16 November 2026 at 23:59 AoE, equivalent to 17 November 12:59 CET. A 3 November organizer notice asks authors not to post public preprints during review.
The Web Conference 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: hri-2027-short-contribution-rebuttal

HRI 2027 short contributions

Only for an existing short-contribution submission, retrieve the reviews and prepare a concise rebuttal tied to the evidence.

The conditional rebuttal deadline falls within the 30-day preparation horizon.

Deliverable
submission confirmation, issue-to-response matrix, final rebuttal and receipt.
Plan target
Official milestone date: 18 November 2026 (in 12 days)
Official milestone
Short-contribution rebuttals are due 17 November 2026 at 23:59 AoE, equivalent to 18 November 12:59 CET. The route exists only for a valid earlier submission.
HRI 2027 short contributions official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: iclr-2027-review-readiness

ICLR 2027

Only for a valid ICLR submission with reviews, triage the reviews and build an evidence-to-response matrix; otherwise record authenticated status without inferring eligibility.

Author–reviewer discussion is underway and ends on a date-only 18 November boundary.

Deliverable
submission/status confirmation, review triage, evidence matrix and focused responses if eligible.
Plan target
Suggested preparation target: 18 November 2026 (in 12 days)
Official milestone
Reviews and discussion began 5 November; discussion ends 18 November. The organizer publishes no cutoff clock or timezone for these stages.
ICLR 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: eddi-2026-attendance-registration

EDDI 2026

If attending EDDI, choose the appropriate category and register before the literal early-bird instant.

The official early-bird deadline is within 15 days.

Deliverable
attendance decision, category/fee record and registration receipt if proceeding.
Plan target
Official milestone date: 19 November 2026 (in 13 days)
Official milestone
EDDI early registration closes 19 November 2026 at 23:59 CEST as printed by the organizer, which is 22:59 CET if interpreted literally. Final registration closes 26 November at 09:59 CEST as printed. The event is 30 November–4 December in Brussels.
EDDI 2026 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: eswc-2027-research-paper-plan

ESWC 2027

Assess research-track fit and prepare a semantic-web or knowledge-graph submission plan against the live organizer-linked EasyChair route.

The official 2027 edition now publishes confirmed dates and live submission milestones.

Deliverable
fit decision, contribution/evaluation outline, author plan and EasyChair readiness record.
Plan target
Suggested preparation target: 20 November 2026 (in 14 days)
Official milestone
ESWC 2027 is in Limassol, 23–27 May. Research abstracts are due 10 December 2026 and full papers 17 December 2026, both 23:59 AoE, equivalent to 11 and 18 December 12:59 CET. The organizer-linked EasyChair research route is open; registration details remain forthcoming.
ESWC 2027 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: dh2027-submission-plan

ADHO DH2027

Finish the contribution and format decision, then prepare the official ConfTool submission package before the 20 November AoE deadline.

Deliverable
track/format choice, completed contribution, anonymization/open-review check, author record, ConfTool submission and receipt.
Plan target
Official milestone date: 21 November 2026 (in 15 days)
Official milestone
ADHO DH2027 proposals are due 20 November 2026 at 23:59 AoE, equivalent to 21 November 12:59 CET. ConfTool is organizer-linked and announced live. The conference uses open review; author identities are visible to reviewers, so anonymization is not required. Generative-AI use must be disclosed. Long papers should report substantial developed results, while ongoing work better fits short papers or posters.
ADHO DH2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: hri-2027-videos-demos-sdc

HRI 2027 videos/demos and Student Design Competition

Only if an eligible HRI video/demo or Student Design Competition entry is intended, choose the correct call and prepare its distinct submission package.

Deliverable
call and eligibility decision, compliant package, author/profile check and submission receipt if proceeding.
Plan target
Official milestone date: 21 November 2026 (in 15 days)
Official milestone
Official submission date: 20 November 2026 at 23:59 AoE; 21 November 12:59 CET Budapest. These calls are distinct from the closed main-paper route.
HRI 2027 videos/demos and Student Design Competition official source ↗

Source checked: 4 November 2026

Suggested action

Task ID: ecml-pkdd-2027-journal-track-monitor

ECML PKDD 2027 Journal Track

Monitor both journal submission systems and OpenReview for the announced opening; only then prepare the dual-submission checklist for a ready eligible manuscript.

The detailed preliminary call is live, but intake opens only when both systems are ready and no later than 30 November.

Deliverable
verified opening status, journal choice, dual-route checklist, reproducibility package and submission decision.
Plan target
Suggested preparation target: 30 November 2026 (in 24 days)
Official milestone
The Journal Track will open when both systems are ready and no later than 30 November 2026. Intake then runs until 31 January 2027 at 23:59 AoE or until the selected journal cap closes. A valid submission requires both OpenReview and the selected journal's SNAPP system; opening is not yet inferred.
ECML PKDD 2027 Journal Track official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: siggraph-asia-2026-attendance-registration

SIGGRAPH Asia 2026

If attending, use only the first 2026 Kuala Lumpur fee table, verify checkout, and keep accepted-contributor obligations separate.

Regular pricing remains open, but the page also contains a duplicated stale 2025 table.

Deliverable
attendance decision, 2026 category/fee record, receipt if proceeding and conditional presenter checklist.
Plan target
Official milestone date: 30 November 2026 (in 24 days)
Official milestone
SIGGRAPH Asia is fully in person in Kuala Lumpur, 1–4 December. Regular rates run through 30 November at 23:59 UTC+8 (16:59 CET). Registrations are non-transferable and non-refundable.
SIGGRAPH Asia 2026 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: webconf-2027-tutorial-proposal

The Web Conference 2027 Tutorials

Reassess whether a justified tutorial with an in-person presenter is worth preparing.

Deliverable
go/no-go decision and, if proceeding, four-page proposal outline, teaser plan and presenter confirmation.
Plan target
Suggested preparation target: 1 December 2026 (in 25 days)
Official milestone
Official deadline: 4 January 2027 at 23:59 AoE. Recheck the organizer-linked portal before submission and do not assume an extension.
The Web Conference 2027 Tutorials official source ↗

Source checked: 25 October 2026

Suggested action

Task ID: acl-2027-arr-readiness

ACL 2027

Reserve the January ARR cycle and prepare author-profile and contributor readiness.

Deliverable
scope decision, timeline, verified metadata and ARR checklist.
Plan target
Suggested preparation target: 4 December 2026 (in 28 days)
Official milestone
Official ARR deadline: 4 January 2027 at 23:59 AoE, equivalent to 5 January 12:59 CET. Commitment, notification and camera-ready remain TBA. The call's current January ARR link resolves to the ACL ARR 2026 root, so verify the correct 2027 venue before submission.
ACL 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: chi-2027-revision-readiness

CHI 2027

Only for a paper explicitly invited to revise and resubmit, build the review/change matrix, revise the manuscript and response, and complete PCS quality assurance.

The revision window is open after the 5 November review release.

Deliverable
eligibility record, review/change matrix, revised paper, response and PCS receipt.
Plan target
Official milestone date: 4 December 2026 (in 28 days)
Official milestone
Revisions are due 3 December 2026 AoE, equivalent to 4 December 12:59 CET. The advertised 24-hour edit contingency is not an extension.
CHI 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: eacl-2027-srw-paper-route

EACL 2027 Student Research Workshop

Prepare a direct SRW paper only for an eligible student-led project and use the now-aligned portal/CFP deadline; keep the ARR commitment-year conflict unresolved.

The direct-paper portal and CFP now agree, but the ARR commitment date remains inconsistent.

Deliverable
eligibility decision, anonymized paper, author/ethics checklist, route confirmation and submission receipt if proceeding.
Plan target
Official milestone date: 16 December 2026 (in 40 days)
Official milestone
Direct workshop papers are due 15 December 2026 at 23:59 AoE, equivalent to 16 December 12:59 CET; the portal matches. The CFP says ARR commitment 22 December 2027 while the portal says 9 January 2027, so the ARR route remains unresolved.
EACL 2027 Student Research Workshop official source ↗

Source checked: 4 November 2026

Suggested action

Task ID: coling-2027-system-demo-monitor

COLING 2027 System Demonstrations

Assess demo-track fit and prepare the package, but do not claim submission is open until the organizer activates the announced OpenReview route.

The official COLING site posted a new System Demonstrations call on 30 October.

Deliverable
fit decision, demo contribution/evaluation outline, author plan, required media checklist and live-route verification.
Plan target
Official milestone date: 19 December 2026 (in 43 days)
Official milestone
System Demonstrations deadline: 18 December 2026 at 23:59 AoE; 19 December 12:59 CET in Budapest. Notification is 23 February and camera-ready 13 March. The organizer labels the OpenReview link 'coming soon,' so submission is not yet open.
COLING 2027 System Demonstrations official source ↗

Source checked: 1 November 2026

Suggested action

Task ID: sigir-2027-proposed-cfp-monitor

SIGIR 2027

Prepare a full-paper readiness checkpoint and monitor for the authenticated route and the remaining non-full-paper calls.

The full-paper CFP is actionable and requires a timely abstract.

Deliverable
fit decision, abstract/paper checklist and verified route.
Plan target
Official milestone date: 15 January 2027 (in 70 days)
Official milestone
Full-paper abstracts are due 14 January 2027 AoE (15 January 12:59 CET) and papers 21 January AoE. SIGIR is in San Jose, 19–24 July 2027.
SIGIR 2027 official source ↗

Source checked: 6 November 2026

Needs confirmation

Task ID: dariah-hr-2026-proceedings-followup

DARIAH-HR Digital Humanities & Heritage proceedings

Only if the person presented a paper or poster at DHH 2025 or DHH 2026, obtain the missing manuscript instructions and decide whether to prepare the joint-proceedings submission.

Deliverable
presenter-eligibility record, verified format/route/fee instructions and, only if eligible and proceeding, a manuscript plan.
Plan target
Official milestone date: 17 January 2027 (in 72 days)
Official milestone
The official DARIAH-HR post-event page invites only DHH 2025/2026 paper or poster presenters to the joint proceedings by 17 January 2027. No cutoff clock/timezone, public manuscript portal, format instructions or fee are exposed; do not infer broader eligibility or make payment from an email alone.
DARIAH-HR Digital Humanities & Heritage proceedings official source ↗

Source checked: 31 October 2026

Suggested action

Task ID: interspeech-2027-main-paper-monitor

Interspeech 2027 main papers

Prepare the main-paper scope and evidence plan while monitoring the forthcoming detailed submission instructions and portal.

Deliverable
fit decision, contribution/evaluation outline, author plan, final instructions/template check and live-portal verification.
Plan target
Official milestone date: 9 February 2027 (in 95 days)
Official milestone
Interspeech 2027 is in São Paulo, 29 August–2 September. The official CFP says the portal opens 19 January 2027, papers are due 9 February, updates 16 February, notification 2 June and camera-ready 9 June; it publishes no cutoff clock or timezone for these date-only milestones. The detailed submission-instructions page and templates remain forthcoming, so the route is not treated as open.
Interspeech 2027 main papers official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: uist-2027-cfp-monitor

UIST 2027

Monitor for the detailed CFP, timezone and PCS route while preparing only a conditional abstract/paper readiness checkpoint.

The official page now lists abstract, paper and supplement dates but omits route and timezone.

Deliverable
verified CFP, timezone, route and preparation checklist.
Plan target
Official milestone date: 31 March 2027 (in 145 days)
Official milestone
UIST 2027 is in Vienna, 26–29 October. The official page lists abstracts 31 March, papers 7 April and supplements 9 April 2027 without a timezone or submission route.
UIST 2027 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: kcap-2027-cfp-monitor

K-CAP 2027

Monitor the canonical edition page for the CFP, milestones, venue details, route, programme and registration.

The official edition identity is live while calls and operations remain forthcoming.

Deliverable
verified CFP, submission requirements, authenticated route and registration plan.
Plan target
Monitor for an official update
Official milestone
K-CAP 2027 is at Carnegie Mellon University in Pittsburgh, 13–15 September 2027, co-located with NeSy. Calls, programme and submission route remain forthcoming.
K-CAP 2027 official source ↗

Source checked: 6 November 2026

Suggested action

Task ID: tpdl-2027-cfp-monitor

TPDL 2027

Monitor the live CFP, tentative date caveat and promised EasyChair route; verify final milestones, requirements, track criteria, fees, registration and programme before deadline-driven preparation.

The CFP is live, but an official series announcement still calls the milestones tentative and the submission route is forthcoming.

Deliverable
verified CFP, finalized milestones, submission requirements and track choice criteria.
Plan target
Monitor for an official update
Official milestone
The live CFP and dates page list workshop proposals 20 February, abstracts 2 April and papers 9 April 2027 at 23:59 AoE without a tentative caveat. An official TPDL series announcement still calls those milestones tentative, so finality remains unresolved. EasyChair is 'announced soon', fees are TBD and no programme is published.
TPDL 2027 official source ↗

Source checked: 6 November 2026

Daily briefing · 6 November 2026

Near-term items were verified through 6 November 2026, 07:22 CET (06:22 UTC). Today’s edition prioritizes the conditional AISTATS workshop proposal, EACL student mentorship and NeurIPS childcare boundaries. AoE means Anywhere on Earth (UTC−12).

Current planner · Conference archive · Dated edition

Conference updates & deadlines

AISTATS workshop proposals close 6 November 2026

The modified official deadline is 6 November at 22:59 CET; proceed only with a complete viable team and programme.

Read findings, evidence and limitations

Finalize the three-page proposal, programme, organizer roles, speaker status and diversity commitment before official OpenReview submission.

Read the source · AISTATS 2027

EACL SRW mentorship closes 7 November

The optional route is for an eligible student-led anonymized draft and is separate from final paper submission.

Read findings, evidence and limitations

Use the earlier CFP boundary of 12:59 CET, one minute before the portal display.

Read the source · EACL 2027 SRW

NeurIPS childcare needs same-day action

Sydney and Atlanta cards give a date-only 6 November reservation boundary for registered attendees.

Read findings, evidence and limitations

Reserve immediately if eligible; the aggregate dates page publishes a later exact timestamp.

Read the source · NeurIPS 2026

Public task board

The board carries unfinished actions forward without treating a passed target as completion. planned is a recommendation; needs_confirmation means eligibility, participation or prior submission must be established first. Official deadlines and suggested preparation targets are labelled separately.

Active submissions and preparation windows

Immediate submissions and review routes.

  • AISTATS workshops: the workshop-specific call closes today at 22:59 CET. Proceed only with a complete viable team and programme; the main CFP contains an obsolete workshop date. Workshop call
  • EACL SRW mentorship: optional, student-eligibility dependent and separate from final paper submission. Use 7 November 12:59 CET, one minute earlier than the portal display. SRW call
  • NeurIPS camera-ready: the dates page gives 7 November 12:59 CET, while Poster Instructions says the stage is already closed. Accepted authors should use authenticated state and support; the public route is not described as open. Dates · Poster instructions
  • WACV attendee pricing: early rates end 8 November 05:59 CET. This does not repair the separate overdue Author-registration obligation for an accepted paper. Registration
  • The Web short papers: mandatory abstracts close 10 November 12:59 CET; short papers and demos follow on 17 November 12:59 CET. Portal displays are later, so use official AoE conversions. Important dates
  • CVPR main papers: enrollment closes 11 November 12:59 CET, papers 17 November 12:59 CET and supplements 24 November 12:59 CET, with no extension. Call for papers
  • NAACL Industry Track: the extended deadline is 14 November 12:59 CET. It is for deployed NLP/speech systems and does not use ARR. Industry Track
  • ICLR discussion: reviews and author–reviewer discussion are underway through 18 November; no cutoff time or time zone is published. Participation remains conditional on a valid authenticated submission. ICLR dates
  • DH2027: open via ConfTool through 21 November 12:59 CET. DH2027 uses open review; author identities are visible to reviewers, so anonymization is not required. Official CFP

Near-term attendance and accepted-author windows

  • AACL-IJCNLP 2026, Hengqin and online, 6–10 November, is live today. Registration remains advertised; all programme times use UTC+8. Author linkage and presentation uploads were separate passed obligations. Registration · Programme
  • EAAMO 2026, Munich with paid virtual access via Zoom, 5–7 November, is on Day 2. Onsite rates remain through 7 November; main accepted-paper presenters must attend in person. Registration
  • LoG 2026, Boston, 20–22 November: the USD 175 rate applied “before November 6” without a clock/timezone and may already have expired. Verify checkout; accepted work needs an in-person author absent approved exception. Registration
  • NeurIPS 2026: public inventory is dynamic. Accepted posters require an assigned-site presenter and a qualifying author registration; virtual-only access is insufficient. Ordinary refund boundaries have passed. Registration · Author registration
  • WACV 2027: early attendee pricing remains open to 8 November 05:59 CET; accepted papers require the distinct Author category. Registration
  • EDDI 2026: use the organizer's literal CEST labels conservatively: 19 November 22:59 CET for early rates and 26 November 08:59 CET for final registration. Current edition
  • SIGGRAPH Asia 2026: fully in person in Kuala Lumpur, 1–4 December. Use the first 2026 fee table, not the duplicated stale 2025 table; regular rates run through 30 November 16:59 CET. Fees

Next seven days: 6–12 November 2026

  • 6 November: AISTATS workshop proposals close 22:59 CET; AACL-IJCNLP is live; use the date-only NeurIPS childcare boundary conservatively.
  • 7 November: EACL SRW mentorship closes 12:59 CET; NeurIPS camera-ready nominally reaches 12:59 CET despite the closed-page conflict.
  • 8 November: WACV attendee early pricing closes 05:59 CET.
  • 9 November: freeze Web short-paper abstract/author data and CVPR enrollment packages before their next-day Budapest boundaries.
  • 10 November: Web short-paper abstracts close 12:59 CET; Interspeech Special Sessions remain date-only with no public clock, timezone or route.
  • 11 November: CVPR mandatory enrollment closes 12:59 CET.
  • 12 November: verify receipts and continue NAACL Industry, Web/CVPR manuscript, NeurIPS accepted-author and HRI rebuttal preparation where eligible.

30-day preparation horizon

  • 13–18 November: NeurIPS video/topics, NAACL Industry, KDD Cycle 1 notification, Web short papers/demos, CVPR papers and HRI short-contribution rebuttal.
  • 19–25 November: EDDI early registration, DH2027, HRI videos/demos/design, LoG attendance and CVPR supplements.
  • 26 November–5 December: EDDI final registration/event, SIGGRAPH Asia, CHI revise-and-resubmit and ECML PKDD Journal Track opening monitor.
  • December preparation: ESWC, EACL SRW direct papers, DH Benelux, MDTT and COLING demonstrations require eligibility and route checks before official deadlines.

Monitoring — active and unresolved watchlist items

This edition screened all 80 maintained conferences. The authenticated workbook is byte-for-byte unchanged from 5 November. Mutable priority, within-30-day, attendance, conflict and assigned future-rotation sources were reopened on 6 November where accessible; other tasks retain their displayed verified_on date.

  • TPDL 2027: Venice, 27–29 September. The live CFP has Computer Science Foundations and Digital Humanities/Digital Libraries tracks, with abstracts 2 April and papers 9 April AoE. The live CFP/date page lists those dates without a tentative caveat, while an official series announcement still calls them tentative; finality remains unresolved. EasyChair is “announced soon”, fees are TBD and no programme is published. CFP · Dates
  • K-CAP 2027: Carnegie Mellon University, Pittsburgh, 13–15 September, co-located with NeSy. Calls, programme and route remain forthcoming. Official edition
  • SIGIR, ACL, ESWC and Interspeech 2027: actionable CFPs list SIGIR full-paper abstract/paper dates of 14/21 January AoE; ACL ARR submission 4 January AoE; ESWC abstract/paper dates 10/17 December AoE; and Interspeech paper intake opening 19 January with a 9 February deadline. SIGIR · ACL · ESWC · Interspeech
  • UIST 2027: Vienna, 26–29 October. The edition page newly lists abstracts 31 March, papers 7 April and supplements 9 April, but omits timezone, detailed CFP and PCS route. Official edition
  • ICML, SEMANTiCS and DARIAH 2027: ICML is in Rio, 31 July–6 August, with CFP pending; SEMANTiCS is in Bologna, 6–8 September, with no CFP; DARIAH is in Aranjuez, 25–27 May, with theme/CFP pending. ICML · SEMANTiCS · DARIAH
  • ICCV and CIKM 2027: ICCV official pages conflict between 3–7 and 2–8 October in Hong Kong. CIKM is in Sydney; ACM SIGWEB lists 25–29 October, while the canonical root lacks an edition CFP/route. ICCV · CIKM
  • AKBC 2027: now identified as a 12th workshop co-located with ACL in Kyoto on 18 or 19 August, exact day and main deadlines pending. Shared-task dates are not the main-paper route. AKBC
  • Still unannounced or incomplete: COLM, CLARIN, AIES, UAI, EMNLP, IJCKG and LoG 2027 lack authenticated current-edition CFPs; NeurIPS confirms only Europe; ISWC gives only October/November with location TBA. No projected deadlines are promoted. COLM · CLARIN · NeurIPS · ISWC

Full watchlist disposition

The maintained workbook contains 80 conferences. Organizer sources, not workbook planning labels, determine current status.

  • 2026 editions screened (34): AAAI-26; SaTML 2026; EACL 2026; HRI 2026; CHI 2026; ICLR 2026; ICASSP 2026; LREC 2026; CVPR 2026; FORC 2026; ICoM 2026; DIS 2026; FAccT 2026; The ACM Web Conference 2026; ACL 2026; ICML 2026; SIGGRAPH 2026; SIGIR 2026; KDD 2026; IJCAI-ECAI 2026; TPDL 2026; Interspeech 2026; CSCW 2026; AIES 2026; EMNLP 2026; UIST 2026; EAAMO 2026; AACL-IJCNLP 2026; SIGGRAPH Asia 2026; NeurIPS 2026; LoG 2026; CLARIN Annual Conference 2026; DARIAH-HR Digital Humanities & Heritage 2026; EDDI 2026. Historical submission routes were not reopened unless an attendance, author-preparation or outcome action remains current.
  • 2027 and cross-year rows screened (46): WACV 2027; IUI 2027; AAAI 2027; HRI 2027; EACL 2027 SRW; ICLR 2027; CHI 2027; AISTATS 2027; MLSys 2027; ESWC 2027; The ACM Web Conference 2027; CVPR 2027; ACL 2027; SIGIR 2027; UAI 2027; KDD 2027; ECML PKDD 2027; TPDL 2027; SEMANTiCS 2027; ICCV 2027; COLM 2027; ISWC 2027; AIES 2027; FAccT 2027; Interspeech 2027; UIST 2027; EMNLP 2027; CIKM 2027; AKBC 2027; K-CAP 2027; ICML 2027; NeurIPS 2027; WSDM 2027; ACDSA 2027; COLING 2027; NAACL 2027; LoG 2027; IJCKG 2027; QDLCA 2027; DARIAH Annual Event 2027; CLARIN Annual Conference 2027; DHNB 2027; 9th Conference on Digital History and Digital Humanities; ADHO DH2027; DH Benelux 2027; MDTT 2027. Every active future row was either freshly checked in the assigned rotation or retained with its earlier structured verification date and next checkpoint.

Changes since the 5 November edition

  • Same-day deadlines: AISTATS workshop proposals now lead; NeurIPS childcare uses the earlier date-only card boundary conservatively.
  • Conflict sharpened: NeurIPS dates retain a future camera-ready deadline while Poster Instructions says the stage is closed.
  • Portal mismatches: EACL mentorship and Web short-paper portals display later instants than official AoE conversions; the planner uses the earlier official boundaries.
  • Live conferences: AACL-IJCNLP is now underway, and EAAMO is on Day 2. Attendance/presenter status is not inferred.
  • Future rotation: UIST deadlines appeared; DARIAH exact dates and K-CAP details were confirmed; AKBC is an ACL workshop rather than an independent conference.
  • No workbook changes: the current file remains byte-for-byte identical. Stale workbook labels were not edited.

Coverage and limitations

The current Drive workbook defines the watchlist, not official deadline evidence. Official organizer, society, university and organizer-linked registration/submission sources control this report. Sources not reopened today retain their task-level verified_on date.

Private acceptance, submission, registration, attendance, payment and completion state were not inferred. Dynamic inventory and authenticated portals remain login-dependent. EDDI checkout triggered a proof-of-work wall; ICCV and NeurIPS contain public conflicts; Interspeech Special Sessions lacks a clock/timezone/route; several future editions omit CFPs. These are disclosed gaps, not evidence of closure or legitimacy.

Verification: two independent source checks passed; conference details remain subject to official organizer updates.

Latest Conferences briefing