O-CEI Second Open Call — newly open from 12 November
O-CEI’s second cascade call is now live for paired cloud-edge-IoT uptake projects.
Read findings, evidence and limitations
Problem and purpose. O-CEI funds uptake projects that adopt its open cloud-edge-IoT methodology and platform in a new real-world setting. Its four prescribed challenges concern energy blackouts, logistics disruption, distributed-ledger market uptake, and open-source virtualisation or home-energy management.
What this opportunity funds / what changed. The owner page and application page now show the call as open after the scheduled 12 November, 13:00 Brussels launch. The €1.6 million call expects up to eight 11-month projects. Each selected two-party project receives a fixed €200,000 lump sum, with result-based ceilings of €15,000 for requirements and design, €100,000 for implementation and €85,000 for demonstration. The located guide does not state a percentage reimbursement rate or standard cofinancing requirement.
Who can apply and what must already exist. The consortium is one eligible SME/startup technology or service provider plus one independent end user of any legal type. Both must have existed before launch and be established in an EU Member State/OCT or Horizon-associated country; they cannot be linked by capital. Applicants need their own available data and distributed cloud-edge-IoT infrastructure, must use at least one O-CEI orchestrator, prepare the required blueprint and layout, exchange knowledge or data with an O-CEI pilot, benchmark the deployment and assess market feasibility. No numeric TRL is stated. Public bodies, universities and research organisations have a gender-equality-plan condition; O-CEI partners, affiliates and staff are excluded.
Opening, deadline, limitations and next action. Applications close 14 January 2027 at 17:00 Brussels time; projects are expected to start 1 May 2027 and include an on-site kick-off in Valencia. The guide contains minor drafting inconsistencies, so the final submission documents control. A business should read the Guide for Applicants and Technical Guidelines, then identify a compliant end user and test the infrastructure, data, challenge, open-source, IP and ownership gates before drafting.