European funding: Slovenia STEP opens as 16 November deadlines near — 14 November 2026
Archived edition. Findings, availability and deadlines reflect this report’s date; consult current original sources before acting.
Daily briefing · 14 November 2026
The strongest verified movement today is national and regional rather
than a new central EU call. Slovenia has opened a €30 million Western
Slovenia STEP scheme, Spain has preannounced a €150 million cooperative
STEP call, Romania is about to open two territorial SME-investment
windows, and Czechia has extended a microelectronics deadline. Their
access gates differ: project location controls the Slovenian and
Romanian routes, Spanish entities and regions control INNTERCONECTA, and
the Czech extension applies only to an approved IPCEI cohort.
Several older opportunities have also entered a two-calendar-day
decision band. The Sustainable Blue Economy Partnership preproposal, EIT
Culture & Creativity’s Spark incubation and EIT Urban Mobility’s
startup investment cut-off all fall on 16 November. Their labels matter:
SBEP funding flows through participating national funders; Spark
combines incubation and grant support in a narrow creative-tech theme;
EIT Urban Mobility is co-investment, not a conventional grant. SYSTEMEU
still has conflicting official deadlines, so a ready team should use the
earliest credible clock.
For companies and founders, the practical lesson is to screen
location, legal form, consortium structure and financing before
technical fit. A broad match to AI, health, clean technology or
digitalisation does not overcome a missing eligible establishment,
approved cohort, private funding round or national funder. The sensible
weekend action is therefore a short gate review: confirm the controlling
document, eligible entity and project site, then either submit an
already mature file, prepare for a later opening, or stop.
1. Priority opportunities and action summary
Call
Funding instrument
Supported amount/rate
Deadline
Eligible applicant profiles, sectors and countries
ERDF-backed state aid for R&D, test infrastructure and new or
expanded production
€30 million call budget; €1 million–€10 million public aid per
project; rates depend on module and company size
1 Apr 2027, 14:00; timezone not stated
Companies of any size, alone or in a consortium of up to five, and
eligible public research organisations; supported activity must be in
Western Slovenia
Test the Western Slovenia establishment, project-scale, revenue,
staffing, credit-rating and independence gates before choosing a
module.
€150 million call budget; €1 million–€4 million project budget; up
to 65%/75%/80% for large/medium/small companies
Opens 17 Nov; closes 23 Dec 2026, 12:00 peninsular-Spain time
Groups of 2–6 Spanish companies, including at least one SME,
operating in at least two of nine eligible regions; digital/deep tech,
clean tech and biotech
Use the preannouncement to form the Spanish consortium, allocate
regions and secure the required research subcontract before the portal
opens.
€7,647,059 across two ITI envelopes; €25,000–€200,000 per project;
startups without a full fiscal year capped at €100,000; up to 90%
programme contribution
Opens 16 Nov, 12:00; closes 16 Dec 2026, 12:00; timezone not
stated
Romanian micro, small and medium enterprises, including startups,
with the supported investment in ITI Țara Făgărașului or the Alba
component of ITI Moții–Țara de Piatră
Confirm the exact ITI investment site, de minimis headroom and 10%
minimum contribution before preparing MySMIS material.
Horizon Europe cascade lump-sum support for knowledge-valorisation
intermediaries
€210,000 FSTP pool; €10,000 solo, €30,000 or €40,000 two-party
strands; €60,000 cumulative cap per organisation
14 Dec 2026, 17:00 CET
Registered intermediaries in EU/Horizon-associated countries; solo
or exactly two independent legal entities from different countries
depending on strand
Map one real valorisation service and client pipeline to the
intermediary definition before selecting a strand.
2. Detailed new and updated funding opportunities
European national and regional funding
European national and regional funding
Slovenia JR STEP Zahod — new call dated 13 November
Slovenia opened a €30 million Western Slovenia STEP call for industrial R&D, testing infrastructure and new or expanded strategic-technology production.
Read findings, evidence and limitations
Problem and purpose. The Slovenian Ministry of the
Economy, Tourism and Sport and ARIS are supporting strategic value
chains in digital and deep technologies, clean and resource-efficient
technologies, and biotechnology. The call is designed for industrial
R&D, testing and experimental infrastructure, and the establishment
or expansion of production in Western Slovenia.
What this opportunity funds / what changed. The official
government notice and ARIS
call page are dated 13 November and show the call as open; no
publication time is supplied, so it cannot be placed precisely after the
prior 05:05:38 UTC prepared-coverage boundary. The call budget is €30
million. Requested public aid must be €1 million–€10 million per
project; that range is public aid, not total eligible project cost.
Activities, financing and expected outcomes. Module
A supports industrial research and experimental development; Module B
supports testing and experimental infrastructure; Module C supports the
establishment of new production or the expansion of existing production.
Module A base rates are 25% for large, 35% for medium and 45% for
micro/small companies, with a possible 15-percentage-point uplift for
qualifying effective cooperation. Module B uses the same 25%/35%/45%
base rates, with no cooperation uplift stated. Module C uses either
regional-aid rates—20%/30%/40% for large/medium/small companies in
standard eligible areas and 30%/40%/50% in eligible Coastal–Karst
areas—or an SME scheme of 10% for medium and 20% for small companies,
depending on the activity and aid basis.
Who can apply. Companies may apply alone or in a
consortium of up to five. Eligible public research organisations may
participate, but cannot coordinate and cannot receive Module C
production aid. The supported activity or investment must be in Western
Slovenia. An EU company headquartered outside Slovenia may apply if it
registers a branch in Western Slovenia no later than the start of
project activities—and before payment of the first claim—and performs
the supported activities there. Consortium members must satisfy the
call’s independence test, including no direct ownership link above 25%
and no shared legal representative in the stated reference period.
Readiness, duration and limitations. Applicants
generally need at least two years of establishment, at least three
employees at 31 December 2025, 2025 net sales equal to at least
one-third of planned eligible costs, and an AJPES rating of at least
SB6. A non-lead partner aged one to two years may use limited relaxed
conditions. Projects may run for up to 36 months and must finish by 31
May 2030; no numeric TRL is stated. Next action: work
through the attached call text and module-specific state-aid rules, then
validate the project site, corporate history, staffing, sales, credit
rating, consortium independence and financing before drafting.
Spain INNTERCONECTA STEP 2026 — preannounced 13 November; not yet open at the cutoff
Spain preannounced a €150 million cooperative STEP call for Spanish company groups working across at least two eligible regions.
Read findings, evidence and limitations
Problem and purpose. CDTI’s forthcoming cooperative
R&D grant targets the three STEP technology fields: digital
technologies, clean and resource-efficient technologies, and
biotechnology. A minimum €10 million of the €150 million call budget is
reserved for projects addressing women’s health.
What this opportunity funds / what changed. CDTI preannounced
the opening on 13 November and published the definitive aid
page. Applications open on 17 November; this is therefore
forthcoming, not an open call at this edition’s cutoff. Project budgets
must be €1 million–€4 million, with at least €175,000 of eligible budget
per participating company. Depending on the industrial-research or
experimental-development classification, support can reach 65% for
large, 75% for medium and 80% for small companies.
Who can apply and where. The applicant group must
contain two to six Spanish-domiciled companies, at least two of them
independent and at least one an SME. It must work in at least two of
Andalucía, Illes Balears, Canarias, Castilla-La Mancha, Castilla y León,
Comunitat Valenciana, Extremadura, Galicia and Murcia. The group needs
an internal consortium agreement and a coordinator; one company may not
carry more than 70% of the project budget, and each company may appear
in no more than two applications.
Activities, duration and next action. At least 10%
of the eligible budget must be subcontracted to research or
knowledge-generating bodies. The scope includes AI, advanced computing,
cybersecurity, microelectronics and semiconductors, clean technology and
biotechnology. Projects start on 1 January 2027 and finish on 31
December 2028 or 30 June 2029; no numeric TRL is stated. The deadline is
23 December 2026 at 12:00 peninsular-Spain time. Next
action: use the pre-opening period to verify regional
allocations, form the Spanish consortium, define work and budget shares,
secure research subcontracting and prepare the internal agreement.
Romania PR Centru 1.4.3 — corrected guide and confirmed 16 November opening
Romania confirmed two place-based SME investment windows opening on 16 November under PR Centru intervention 1.4.3.
Read findings, evidence and limitations
Problem and purpose. The two calls support the
competitiveness and productive investment of SMEs in two Integrated
Territorial Investment areas of Romania’s Centre Region. This is a
place-based investment route, not a Europe-wide software or R&D
grant.
What this opportunity funds / what changed. On 13
November, ADR Centru published Corrigendum
2 and an opening
notice. The corrigendum changes sections 5.1.1, 5.3.2 and 7.4 of the
guide and contract Annex 17; applicants must use the corrected
documents. Submissions run from 16 November at 12:00 to 16 December at
12:00; the official pages do not state a timezone.
Funding and activities. The combined budget is
€7,647,059: €5,352,941 for ITI Țara Făgărașului and €2,294,118 for the
Alba-county component of ITI Moții–Țara de Piatră. Solo SME projects may
request €25,000–€200,000; startups without a complete fiscal year are
capped at €100,000. The programme contribution can reach 90% under de
minimis rules, with at least 10% applicant contribution. Eligible
activities include premises and production/service-space modernisation,
equipment, specialised software and digital solutions, e-commerce,
training, greener production, resource efficiency, renewable-energy
systems, consultancy, management, audit, internationalisation and
certification.
Who can apply and next action. Applicants are
Romanian commercial companies that qualify as micro, small or medium
enterprises, including startups, and have or make the supported
investment in the named ITI territory. A software company outside the
territory is not made eligible merely because software is an eligible
cost. Next action: confirm the precise project site,
SME and startup status, de minimis headroom, own contribution and
corrected-guide conditions before preparing the MySMIS application.
Czech IPCEI Microelectronics and Communication Technologies — deadline extended, but no new applicant route
Czechia extended the IPCEI Microelectronics and Communication Technologies deadline, but only for the already approved cohort.
Read findings, evidence and limitations
What changed. The Czech Business and Investment
Development Agency announced
on 13 November that the deadline moves from 16 November 2026 at
09:59:59 to 1 February 2027 at 09:59:59; the page does not state a
timezone.
Eligibility and limitation. This is not an open
invitation to new applicants. Only projects already included in the
notified and approved IPCEI Microelectronics and Communication
Technologies cohort under Commission State-aid decision SA.101141
(2023/N) may apply. Eligible beneficiaries are businesses or research
organisations already in that cohort, for industrial research,
experimental development and demonstration. Applicant maxima are set by
the Commission decision; the summary page states no uniform amount,
rate, call budget, duration or TRL. Next action: an
entity not named in the approved cohort should take no application
action.
Stage-one preproposal for a 36-month transnational R&I project.
Funding-seeking partners must satisfy participating national/regional
rules; Hungary has no funder in the current call, so a Hungarian partner
would be self-funded, would not count toward the three-funded-country
minimum and could not coordinate. The owner page reports €39.2 million,
while an EC summary reports about €38 million; national annexes control
awards and rates.
Incubation plus up to €30,000, potentially 100% of eligible costs,
for individuals or early-stage teams without a registered company that
commit to forming a for-profit entity. The current cohort is limited to
fashion, architecture and advanced-materials ventures; generic AI,
publishing or creative work is insufficient.
Co-investment, not a conventional grant. Up to €2.5 million for an
eligible pre-seed, seed or Series A urban-mobility startup already in an
active private raise, with an MVP/prototype/pilot and the call’s
ownership/valuation conditions. The next cut-off is 11 January
2027.
Romanian research-organisation–SME partnerships under regional call
splits. Partner-level amounts, rates and cofinancing depend on the
applicant and activity category and must be checked in the current
guide.
16 Nov, 23:59 CET — conservative operational clock
The owner page, FAQ and current EISMEA page say 23 November at 17:00
Brussels, while the indexed Funding & Tenders record still says 16
November at 23:59 Brussels. No official reconciliation was found. A
ready eligible team should use the earlier credible clock and seek
written confirmation. An entity outside the five SYSTEMEU territories
may participate only as the single self-funded partner, receive 0% FSTP
and cannot coordinate.
Fourteen-day milestone. One incubator operator can receive up to
€60,000 to run a 12-week English-language programme for at least 30
startups. This is for an experienced GenAI/NLP incubator with
facilities, mentors and networks, not for a startup product.
Thirty-day milestone. Six-month cascade projects support
knowledge-valorisation intermediaries through a €10,000 solo strand or
€30,000/€40,000 two-country strands, with physical secondment in the
latter routes.
The Global
EbA Fund medium-grant page now resolves its deadline as 16 November
at 23:59 PST, equivalent to 17 November at 08:59 CET. It is therefore
not a 16 November Central European deadline. This correction avoids an
eight-to-nine-hour early conversion error; applicants should still use
the official page and their own local conversion.
4. Synthesis and practical actions for companies, startups and entrepreneurs
Separate geography from sector fit. Slovenia, Spain
and Romania all support digital or strategic technologies, but their
establishment and project-site rules control eligibility.
Distinguish a new route from an administrative
change. The Czech IPCEI deadline extension helps only the
already approved cohort; it creates no application path for a new
semiconductor company.
Classify finance correctly. EIT Urban Mobility is
investment/co-investment; SBEP is delivered through national and
regional funders; Spark combines incubation with grant support; the ECCC
consultation below is neither funding nor procurement.
Use milestone reminders for mature files.
Two-calendar-day calls are not sensible starting points unless the
applicant, partners, evidence and budget are already assembled. Where a
later cut-off exists, record it instead of forcing an incomplete
submission.
Resolve conflicting clocks conservatively. SYSTEMEU
has not reconciled its official records. A ready team should work to the
Funding & Tenders date of 16 November at 23:59 CET and obtain
written confirmation rather than relying on the later owner/EISMEA
date.
Test capacity as well as eligibility.
Multi-million-euro STEP projects require revenue, staffing, finance and
governance proportionate to delivery; a matching technology keyword does
not establish readiness.
These are assessment and preparation recommendations. No application,
consortium commitment, consultation response, investment request, tender
response or funder contact has been made.
News from major European funding institutions and programmes
ECCC
opens a preliminary market consultation — not funding or
procurement
On 13 November, the European Cybersecurity Competence Centre opened a
voluntary, non-binding consultation on possible future
Community-to-Market services. Organisations and economic operators with
relevant civilian cybersecurity, market-intelligence, digital-platform,
training, community, communications, events or research-to-market
expertise may respond. The news
announcement gives 23 November at 12:00 CET, while the ECCC tender-opportunities
page gives 18 November at 23:59 Europe/Bucharest. This unresolved
owner-page conflict should be treated conservatively: use the earlier
clock and seek clarification. The consultation seeks evidence on
feasibility, market capacity, resources, costs, contract models and
delivery risks. Participation is not a tender submission, gives no
funding and confers no advantage or disadvantage in any future
procurement.
Commission
launches a climate-and-health research-funder alliance — not an open
call
The European Commission and Wellcome launched the Multilateral
Initiative on Climate & Health Research Funding on 13 November. It
is intended to align funding priorities, research quality and pathways
from evidence to policy and practice. Formal membership will be open to
organisations that fund climate-and-health research; the Commission is
funding the secretariat through an existing Coordination and Support
Action from January 2027 to December 2029. No project-application route,
applicant budget, rate or deadline for an ordinary company is stated. European
Commission announcement
EU–Australia
Horizon Europe agreement expands the 2027 consortium pool
The EU and Australia signed their Horizon Europe association
agreement on 12 November. From 1 January 2027, transitional arrangements
are intended to let Australian entities apply as prospective
beneficiaries and lead Pillar II consortia, subject to each call; formal
association is expected after treaty procedures around mid-2027. The
cited €52.4 billion is the Pillar II programme envelope, not a new call
or applicant award. For European companies, the operational value is a
larger partner and coordinator pool in health, digital, climate, energy
and industrial topics. European
Commission announcement · Australian
implementation page
Coverage, cutoff and verification note
Coverage ended at 14 November 2026, 04:59:53 UTC
(05:59:53 CET). The last actual merged Sent cutoff was
10 November 2026, 05:29:51 UTC; the rolling catch-up
began 7 November 2026, 04:59:53 UTC. Prepared/public
editions through 13 November 2026, 05:05:38 UTC were
used for duplicate suppression but were not counted as delivery.
National items dated 13 November without publication times are labelled
at date level and cannot be placed precisely after that prepared
boundary.
Coverage included all daily HIGH registry sources, source 20,
active-deadline owners and the Saturday rotation of sources 6, 13, 20,
27, 34, 41, 48 and 55, plus a bounded national/regional sweep. The two
scouts screened 41 assigned registry sources and opened more than 30
official primary pages/documents; overlapping sources were deduplicated.
Defence and ambiguous defence-oriented dual-use opportunities were
excluded.
Material gaps included account-dependent or non-enumerable
FundingBox/F6S inventories, a 404 Pályázat.gov.hu homepage, an NIÜ news
route in maintenance, inaccessible or partly accessible EIT
Manufacturing, EIT Digital, EIT Health, Clean Hydrogen and Clean
Aviation pages, and dynamic Funding & Tenders inconsistencies.
National and regional sampling was bounded rather than exhaustive.
Previously prepared items were suppressed unless materially changed or
reaching a 30/14/7/2-day milestone.
Verification: two independent source checks passed; eligibility
assessments remain subject to the official call conditions.